This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
operations:agenda2016_07_21 [2016/07/20 13:41] Ross Turner |
operations:agenda2016_07_21 [2016/07/21 00:04] Jim Lovell |
||
---|---|---|---|
Line 6: | Line 6: | ||
**General Issues:** | **General Issues:** | ||
- | * Organising Modules - need a way of informing observers which module to record to. | + | * Hobart 26m wind stowing or being stowed after Jim's observations, requires a manual reset an a trip to Mt Pleasant. |
+ | * Organising Modules; need a way of informing observers which module to use. | ||
* Night-time observations (what is expected as an observer and what is safe?): | * Night-time observations (what is expected as an observer and what is safe?): | ||
- | ** Completing check lists, verifying experiment started and handing over. | + | * Completing check lists, verifying experiment started and handing over. See the new [[operations:observerduties|Observer Duties and Shift Times]] section in [[operations:documentation_ops2_pcfs9.10.5plus|Operator Documentation for observations]] |
- | ** Driving cars out to Mt Pleasant. | + | * Driving cars out to Mt Pleasant. |
**Issues taken from handover notes** | **Issues taken from handover notes** | ||
- | * Don't stow the 26m after observations, can often require a manual reset requiring a trip to the Mt Pleasant. | + | * eRemote Control freezing. |
+ | * Recording to wrong modules; and recording to malfunctioning modules. |