This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
operations:agenda2018_07_12 [2018/07/12 01:42] Lucas Hyland |
operations:agenda2018_07_12 [2018/07/12 03:00] Lucia McCallum |
||
---|---|---|---|
Line 8: | Line 8: | ||
**General Issues** | **General Issues** | ||
+ | |||
+ | Yarragadee humdity sensor buggy? **sometimes** only reports 0.0 or 100.0. | ||
+ | Hobart26m cooling and modules. Discuss. | ||
+ | |||
+ | LBA COMING UP NEXT WEEK. Everyone ready? | ||
+ | |||
+ | Observer on duty - little board | ||
+ | |||
+ | IVS GM feedback - notes do get read! | ||
+ | |||
+ | AUM sessions in Aug/Sep | ||
Line 15: | Line 26: | ||
"field system stopped 11:55 (183) UT schedule not resumed until 05:25 (184) UT (Warren)" - field system crashed? | "field system stopped 11:55 (183) UT schedule not resumed until 05:25 (184) UT (Warren)" - field system crashed? | ||
- | RD1805 - Hobart pressure needed pumping. | + | RD1805/RD1804 - Hobart pressure needed pumping. |
+ | |||
+ | CRF107 issues- rxp (resolved), sound (resolved), module not put in. |