User Tools

Site Tools


operations:agenda2020_11_05

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
operations:agenda2020_11_05 [2020/11/04 20:49]
Wilson-Mayne
operations:agenda2020_11_05 [2020/11/05 01:29]
Wilson-Mayne
Line 20: Line 20:
     * Yg: mk5cn timed-out connection closed (Lim)     * Yg: mk5cn timed-out connection closed (Lim)
  
- + **Previous Fortnight**
-**PREVIOUS FORTNIGHT**+
  
   * AUA069   * AUA069
     * Hb 12m: reconfigured dbbcho as delays and power reported “bad” (warren)     * Hb 12m: reconfigured dbbcho as delays and power reported “bad” (warren)
-       +        ​
-      ​+
   * AUM020   * AUM020
     * Hb 12m: Both pols of S-band now connected (Y-pol previously disconnected) (JMc)     * Hb 12m: Both pols of S-band now connected (Y-pol previously disconnected) (JMc)
/home/www/auscope/opswiki/data/pages/operations/agenda2020_11_05.txt · Last modified: 2020/11/05 02:09 by Wilson-Mayne