This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
operations:documentation_ops2 [2012/08/15 02:09] Jim Lovell [Observations on the 12m telescopes from the Control Room] |
operations:documentation_ops2 [2012/08/16 00:30] Jim Lovell [Observations on the 12m telescopes from the Control Room] |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Operator Documentation ====== | ====== Operator Documentation ====== | ||
- | ===== Background ===== | + | ====== Background ====== |
* [[http://auscope.phys.utas.edu.au|About the AuScope VLBI Project]] | * [[http://auscope.phys.utas.edu.au|About the AuScope VLBI Project]] | ||
* Operator {{:operations:auscope_operator_training.pdf|training documentation}} (PDF). Includes project background, info on scheduling and rosters, overview of the telescopes and related hardware. | * Operator {{:operations:auscope_operator_training.pdf|training documentation}} (PDF). Includes project background, info on scheduling and rosters, overview of the telescopes and related hardware. | ||
* [[operations:acronyms|Acronym dictionary]] | * [[operations:acronyms|Acronym dictionary]] | ||
- | ===== Observations on the 12m telescopes from the Control Room ===== | + | ====== Observations on the 12m telescopes from the Control Room ====== |
These are notes on IVS observations from ops2, the six-monitor PC in the AuScope VLBI Operations room in Hobart. | These are notes on IVS observations from ops2, the six-monitor PC in the AuScope VLBI Operations room in Hobart. | ||
- | The main control interface during an observation is [[http://www.econtrol-software.de/|e-Remote Control]], which communicates with the PC Field System (PCFS) machines at the observatories. All the computers at the observatories have names ending with their two-letter telescope ID: | + | If you are unfamiliar with the computers and software used at the sites and in the control room, please read this before continuing: |
- | * Hb = Hobart 12m | + | * [[[[operations:documentation:computers_software|Introductory notes on computers and software]] |
- | * Ke = Katherine | + | |
- | * Yg = Yarragadee | + | |
- | There are four computers at each site that run the most important items of hardware or software. They are: | + | |
- | ^Type ^ Function ^ Computer Name ^^^ Access with... ^ | + | ===== IVS Observations ===== |
- | ^ ^ ^ Hobart ^ Katherine ^ Yarragadee ^ ^ | + | |
- | |PC Field System | Linux PC that runs Field System software to control the antenna, DBBC and Mark5 | pcfshb | pcfske | pcfsyg | ssh, VNC (display 1) | | + | |
- | |Mark5 recorder | A Linux PC inside the Mark5 recorder which runs dimino, a program the PCFS communicates with to control data recording | mk5hb | mk5ke | mk5yg | ssh | | + | |
- | |Timing PC | Windows PC that monitors the H maser, the CNS-II GPS clock, shows the wind speed and direction, and runs HMI: a GUI for controlling and monitoring the antenna | timehb | timeke | timeyg | VNC display 0| | + | |
- | |DBBC | A Windows PC in the DBBC which runs a server (and optionally a client) program to allow control and monitoring of the DBBC | dbbchb | dbbcke | dbbcyg | VNC display 0| | + | |
- | + | ||
- | Each of the above can be accessed either through a terminal via ssh or by starting up a VNC session. It is necessary to bring up the VNC sessions when setting up for an observation or when doing one of the regular ~2 hourly system checks. Given the slow network connection to Yarragadee it is not recommended to keep the VNC sessions up at other times. | + | |
- | + | ||
- | VNC or terminal sessions can be started via the Application menu on ops2 in the top left of the desktop. e.g. for Yarragadee: | + | |
- | Applications -> AuScope Yarragadee -> VNC -> [choose the server] | + | |
- | {{:operations:ops4applicationsmenu.jpg?500}} | + | |
- | + | ||
- | Lastly, check that the software on the timing PCs is running | + | |
- | * [[operations:documentation.ivs.timingsw|Software on the timing PC]] | + | |
- | 0|}} | + | |
- | + | ||
- | VNC sessions can also be started up on the command line. e.g: | + | |
- | <code> | + | |
- | vncviewer -shared pcfshb:1 | + | |
- | vncviewer -shared dbbcke:0 | + | |
- | </code> | + | |
- | + | ||
- | ==== IVS Observations ==== | + | |
Below is a step-by-step procedure for making IVS observations on the 12m telescopes. The current version of e-RemoteCtrl has a built-in checklist which can now be used during the setup procedure. So the first task is to start the Observing and monitoring software at each site, then e-RemoteCtrl. | Below is a step-by-step procedure for making IVS observations on the 12m telescopes. The current version of e-RemoteCtrl has a built-in checklist which can now be used during the setup procedure. So the first task is to start the Observing and monitoring software at each site, then e-RemoteCtrl. | ||
- | === Before the Observations === | + | ==== Before the Observations ==== |
- | == Timing PC Software == | + | === Timing PC Software === |
Check that the software on the timing PCs is running: | Check that the software on the timing PCs is running: | ||
* [[operations:documentation.ivs.timingsw|Software on the timing PC]] | * [[operations:documentation.ivs.timingsw|Software on the timing PC]] | ||
- | == Field System Software == | + | === Field System Software === |
* [[operations:starting_fs|Starting the PC Field System Software]] | * [[operations:starting_fs|Starting the PC Field System Software]] | ||
- | == System Monitor == | + | === System Monitor === |
* [[operations:starting_sysmon|Start the System Monitor]] | * [[operations:starting_sysmon|Start the System Monitor]] | ||
- | == e-Remote Ctrl == | + | === e-Remote Ctrl === |
* [[operations:starting_eRemoteCtrl|Start e-Remote Ctrl]] | * [[operations:starting_eRemoteCtrl|Start e-Remote Ctrl]] | ||
* [[operations:eRemoteCtrl_newPCFSLog|Open a new PCFS log file]] | * [[operations:eRemoteCtrl_newPCFSLog|Open a new PCFS log file]] | ||
Line 64: | Line 38: | ||
The checklist should now be visible. The items in the list are described below and can be ticked off as you go | The checklist should now be visible. The items in the list are described below and can be ticked off as you go | ||
- | == The Before Observation Checklist == | + | === The Before Observation Checklist === |
- | = Prepare the schedule file = | + | == Prepare the schedule file == |
* [[operations:documentation.ivs.drudg|Preparing the schedule and procedure files]] | * [[operations:documentation.ivs.drudg|Preparing the schedule and procedure files]] | ||
Line 72: | Line 46: | ||
* [[operations:documentation.ivs.drudg_ureop|Additional schedule preparation for Hb ultra-rapid EOP experiments]] | * [[operations:documentation.ivs.drudg_ureop|Additional schedule preparation for Hb ultra-rapid EOP experiments]] | ||
- | = Check the maser = | + | == RF and IF signal path == |
- | = DBBC Configuration = | + | * [[operations:rf_if_check|Configuring the RF and IF signal paths]] |
- | = Mark5 Recorder setup = | + | |
- | = Clock and delay check = | + | |
- | = Test recording = | + | |
- | = System Temperature (Tsys) check = | + | |
- | = Antenna checks = | + | |
- | = Weather checks = | + | |
- | = Fringe check = | + | |
- | = Send a Station Ready email = | + | |
+ | == Check the maser == | ||
+ | * [[operations:maser_check|Hydrogen Maser check]] | ||
+ | == DBBC Configuration == | ||
The Digital Base-Band Converter (DBBC) takes the IF signals from the telescope and digitises them for the Mark5 recorder. The DBBC needs to be properly configured prior to an observation: | The Digital Base-Band Converter (DBBC) takes the IF signals from the telescope and digitises them for the Mark5 recorder. The DBBC needs to be properly configured prior to an observation: | ||
- | * [[operations:documentation.DBBCSetupIVS|Configuring the DBBC]] | + | * [[operations:documentation.DBBCSetupIVS_v2|Configuring the DBBC]] |
+ | |||
+ | == Mark5 Recorder setup == | ||
Next the Mark5 recorder needs to be prepared for the observations. | Next the Mark5 recorder needs to be prepared for the observations. | ||
- | * [[operations:documentation.ivs.mark5|Mark5B recorder setup]] | + | * [[operations:documentation.ivs.mark5_v2|Mark5B recorder setup]] |
+ | |||
+ | == Clock and delay check == | ||
+ | * [[operations:documentation.clock_and_delay_check|Checking clock offsets and delays]] | ||
+ | |||
+ | == Test recording == | ||
+ | * [[operations:documentation.test_recording|Making a test recording]] | ||
+ | |||
+ | == System Temperature (Tsys) check == | ||
+ | * [[operations:documentation.test_tsys|Tsys measurement]] check | ||
+ | |||
+ | == Antenna checks == | ||
+ | * [[operations:documentation.test_antenna|Antenna checks]] | ||
+ | |||
+ | == Weather checks == | ||
+ | * [[operations:documentation.weather_check|Weather conditions]] | ||
+ | |||
+ | == Fringe check == | ||
+ | == Send a Station Ready email == | ||
+ | |||
+ | |||
+ | |||
Lastly, check that the software on the timing PCs is running | Lastly, check that the software on the timing PCs is running | ||
* [[operations:documentation.ivs.timingsw|Software on the timing PC]] | * [[operations:documentation.ivs.timingsw|Software on the timing PC]] | ||
- | === Starting and Monitoring === | + | ==== Starting and Monitoring ==== |
* [[operations:starting_monitoring|Starting an monitoring the observations]] | * [[operations:starting_monitoring|Starting an monitoring the observations]] | ||
Line 98: | Line 90: | ||
* [[operation:fringe_checking| Fringe-checking the AuScope array]] | * [[operation:fringe_checking| Fringe-checking the AuScope array]] | ||
- | === After the Observations === | + | ==== After the Observations ==== |
At the end of an observation: | At the end of an observation: | ||
* [[operations:documentation.ivs.finishing|Finishing up]] | * [[operations:documentation.ivs.finishing|Finishing up]] | ||
Line 105: | Line 97: | ||
| | ||
- | ==== eVLBI observations ==== | + | ===== eVLBI observations ===== |
* [[operations:documentation.eVLBI|eVLBI]] | * [[operations:documentation.eVLBI|eVLBI]] | ||
- | ==== Fringe Checking ==== | + | ===== Fringe Checking ===== |
* [[operations:documentation.fringe.schedfile|Schedule file preparation]] | * [[operations:documentation.fringe.schedfile|Schedule file preparation]] | ||
* [[operations:documentation.fringe.observing|Observing]] | * [[operations:documentation.fringe.observing|Observing]] | ||
Line 115: | Line 107: | ||
- | ===== User accounts and email addresses ===== | + | ====== User accounts and email addresses ====== |
Gmail accounts have been set up for registration with skype and other services. The usual Observer password applies. | Gmail accounts have been set up for registration with skype and other services. The usual Observer password applies. | ||
- | ==== Katherine ==== | + | ===== Katherine ===== |
gmail: keobserver@gmail.com | gmail: keobserver@gmail.com | ||
Line 124: | Line 116: | ||
Skype: keobserver | Skype: keobserver | ||
- | ==== Yarragadee ==== | + | ===== Yarragadee ===== |
gmail: ygobserver@gmail.com | gmail: ygobserver@gmail.com | ||
Line 132: | Line 124: | ||
- | ==== Hobart 12m ==== | + | ===== Hobart 12m ===== |
gmail: hbobserver@gmail.com | gmail: hbobserver@gmail.com | ||
skype: hbobserver | skype: hbobserver |