User Tools

Site Tools


wg7:gnss_vlbi:2016:328a:328a

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
wg7:gnss_vlbi:2016:328a:328a [2016/11/30 07:04]
Andreas Hellerschmied [Scheduling]
wg7:gnss_vlbi:2016:328a:328a [2016/11/30 07:05]
Andreas Hellerschmied [Tracking]
Line 44: Line 44:
   * Stepwise tracking ​   * Stepwise tracking ​
     * 9 sec repos. int.     * 9 sec repos. int.
-    * VEX files with tracking points in topo. RaDec+    * VEX files with tracking points in topo. RaDec (calculated with TLE data)
  
  
/home/www/auscope/opswiki/data/pages/wg7/gnss_vlbi/2016/328a/328a.txt · Last modified: 2016/11/30 07:13 by Andreas Hellerschmied