This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision | |||
|
handover:r4841 [2018/05/11 06:40] Warren Hankey |
handover:r4841 [2018/05/11 09:18] (current) Arwin Kahlon |
||
|---|---|---|---|
| Line 10: | Line 10: | ||
| *06:24 UT delay large reconfigure dbbc (W) | *06:24 UT delay large reconfigure dbbc (W) | ||
| *06:38 UT resumed schedule (W) | *06:38 UT resumed schedule (W) | ||
| + | *09:02 UT Halted schedule. Delay was drifting again, power-cycled dbbc. (Arwin) | ||
| + | *09:16 UT resumed schedule. (Arwin) | ||
| **Yarragadee 12m** | **Yarragadee 12m** | ||