This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
operations:agenda2013_11_12 [2013/11/11 22:03] Jim Lovell |
operations:agenda2013_11_12 [2013/11/12 00:31] (current) Jim Lovell |
||
|---|---|---|---|
| Line 16: | Line 16: | ||
| * R1610 | * R1610 | ||
| * R4610 | * R4610 | ||
| - | |||
| - | jamie in CD | ||
| - | timing of next meeting: procedures | ||
| - | |||
| - Previous Action Items | - Previous Action Items | ||
| - | - Yg clock jumps. No recent problems have been observed. The delay difference is now higher at ~0.4 us but looks stable. | ||
| - Light in Ke control room (Brett, Martin). Still to do. | - Light in Ke control room (Brett, Martin). Still to do. | ||
| - | - Fringe check script. This seems to be working again but please tell Jamie if you have problems with it. | + | - Katherine RFI (Monitor full band (Martin, Jim)). WiFi turned off. Better? Is there a good data monitoring/collection method? (Jamie) |
| - | - Katherine RFI (Monitor full band (Martin, Jim)). This seems to be intermittent, but we are monitoring it. Is there a good data monitoring/collection method? | + | |
| - Processing logs, multiple disks [[operations:agenda2013_10_08_eg1|Example]] | - Processing logs, multiple disks [[operations:agenda2013_10_08_eg1|Example]] | ||
| - Hand editing required. Chris has volunteered to look at fixing the script(s) | - Hand editing required. Chris has volunteered to look at fixing the script(s) | ||
| - | - Which modules to use (Imogen, Jamie). | + | - Which modules to use (Imogen, Jamie). See [[operations:start|Operations page]] |
| - | - Recent software, hardware changes. | + | |
| - | - Jim to talk to Gino about diagnosing the problem at Ke. | + | |
| - | - Jamie: A 26m Mark5A upgrade will allow Mk5B modules to be read. 5C going to Ceduna. | + | |
| - | - Plans are afoot to allow the 26m and 12m to run off same clock, swap between them. | + | |
| - | - A 26m maser service is due soon. | + | |
| - 26m IVS documentation will need updating before May 2014 | - 26m IVS documentation will need updating before May 2014 | ||
| + | - Question for Brett: how to find out the network status at the three sites (e.g. 3G or wired). | ||
| + | - Recent software, hardware changes. | ||
| + | - Jim to talk to Gino about diagnosing the problem at Katherine. Ongoing | ||
| + | - Mark5 to Yarragadee for conditioning | ||
| - Operational issues | - Operational issues | ||
| - | - Yarragadee support in November | + | - Jamie in Ceduna from this week until end of LBA run. On call: phone Ceduna control room 08 8625 3070 |
| + | - AUST17 cancelled | ||
| + | - LBA Observing next week. | ||
| + | - Upcoming 'marathon' observing run. Any questions? | ||
| + | - Next meeting will focus on observing the big session. Helpful to get as many observers to the meeting as possible. | ||
| - Q & A | - Q & A | ||
| - | - Question for Brett: how to find out the network status at the three sites (e.g. 3G or wired). | + | - |
| - | - Next meeting : Tue 12 Nov at 2 PM | + | - Next meeting : ? |