This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
operations:documentation.ivs.logs [2012/04/26 05:03] Jim Lovell [Processing log files and shipping the data] |
operations:documentation.ivs.logs [2013/12/04 19:38] (current) Jamie McCallum |
||
|---|---|---|---|
| Line 5: | Line 5: | ||
| ^ From ^ To: ^^^^ | ^ From ^ To: ^^^^ | ||
| - | ^ ^ Bonn ^ Washington ^ Haystack ^ VLBA ^ | + | ^ ^ Bonn ^ Washington ^ Haystack ^ VLBA ^ Curtin |
| - | | Hb | eTransfer | eTransfer | ship | ship | | + | | Hb | eTransfer | eTransfer | eTransfer | ship | eTransfer |
| - | | Ho | eTransfer | eTransfer | ship | ship | | + | | Ho | eTransfer | eTransfer | eTransfer | ship | eTransfer |
| - | | Ke | eTransfer (*) | ship | ship | ship | | + | | Ke | eTransfer (*) | ship | ship | ship | eTransfer (*) |
| - | | Yg | eTransfer (*) | ship | ship | ship | | + | | Yg | eTransfer (*) | ship | ship | ship | eTransfer (*) |
| - | | * = modules are shipped to Hobart and then eTransferred ||||| | + | | * = modules are shipped to Hobart and then eTransferred |||||| |
| + | The correlator that the data are to be shipped to is given in the detailed listing on the Google Calendar and in the Master Schedule. See the [[operations:schedule|schedules]] page on this wiki. | ||
| + | |||
| + | Regardless of whether the data are to be shipped or eTransferred please follow these notes on [[operations:documentation.ivs.commentsfile| preparing the comments file and transferring the logs]]. | ||
| + | |||
| + | At the moment all shipping of modules (physical or eTransfer) is being handled by observatory staff and on-call people. Operators: there's no need to proceed with any of the following steps. | ||
| + | |||
| + | If data are being eTransferred, the transfer can be started from Hobart if they are going to Bonn, but for Washington, the transfer is started from the correlator. | ||
| + | |||
| + | * Notes on making a [[operations:documentation.ivs.BonnETransfer|eTransfer to Bonn]] | ||
| + | |||
| + | Some additional steps are required when shipping modules and are done at the observatories: | ||
| ===== Shipping media from Hobart ===== | ===== Shipping media from Hobart ===== | ||
| * [[operations:documentation.ivs.hbpaperwork1|Prepare the shipping paperwork for Hobart]] | * [[operations:documentation.ivs.hbpaperwork1|Prepare the shipping paperwork for Hobart]] | ||
| - | * [[operations:documentation.ivs.commentsfile|Prepare the comments file and transfer the logs]] | ||
| * [[operations:documentation.ivs.hbpaperwork2|Complete the paperwork, pack the disks and ship them]] | * [[operations:documentation.ivs.hbpaperwork2|Complete the paperwork, pack the disks and ship them]] | ||
| - | |||
| - | |||
| - | ===== E-transfer from Hobart ===== | ||
| - | * [[operations:documentation.ivs.commentsfile|Prepare the comments file and transfer the logs]] | ||
| - | * [[operations:documentation.ivs.BonnETransfer|eTransfer to Bonn]] | ||
| ===== Shipping media from Katherine ===== | ===== Shipping media from Katherine ===== | ||
| + | |||
| ===== Shipping media from Yarragadee ===== | ===== Shipping media from Yarragadee ===== | ||
| - | * [[operations:documentation.ivs.commentsfile|Prepare the comments file and transfer the logs]] | ||
| == Useful odds and ends == | == Useful odds and ends == | ||
| - [[operations:documentation.ivs.useful|Useful log filtering commands]] | - [[operations:documentation.ivs.useful|Useful log filtering commands]] | ||
| - | |||