This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
operations:documentation_ops2 [2012/09/04 05:13] Jim Lovell [Before the Observations] |
operations:documentation_ops2 [2012/09/18 06:18] (current) Jim Lovell [Starting and Monitoring] |
||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== Operator Documentation ====== | + | ====== Operator Documentation for observations from ops2 ====== |
| ====== Background ====== | ====== Background ====== | ||
| Line 45: | Line 45: | ||
| * On occasions, the Hobart data are written to disk between scans for e-transfer to Tsukuba for ultra-rapid EOP observations. Some additional changes to the schedule files are required in this case: | * On occasions, the Hobart data are written to disk between scans for e-transfer to Tsukuba for ultra-rapid EOP observations. Some additional changes to the schedule files are required in this case: | ||
| * [[operations:documentation.ivs.drudg_ureop|Additional schedule preparation for Hb ultra-rapid EOP experiments]] | * [[operations:documentation.ivs.drudg_ureop|Additional schedule preparation for Hb ultra-rapid EOP experiments]] | ||
| + | * [[operations:starting_monitoring_urEOP|Additional tasks prior to starting Ultra-rapid EOP observations]] | ||
| + | |||
| == RF and IF signal path == | == RF and IF signal path == | ||
| Line 84: | Line 86: | ||
| * Start Skype and begin a chat session with all participating sites plus the on-call person | * Start Skype and begin a chat session with all participating sites plus the on-call person | ||
| - | |||
| - | |||
| - | |||
| - | Lastly, check that the software on the timing PCs is running | ||
| - | * [[operations:documentation.ivs.timingsw|Software on the timing PC]] | ||
| ==== Starting and Monitoring ==== | ==== Starting and Monitoring ==== | ||
| - | * [[operations:starting_monitoring|Starting an monitoring the observations]] | + | * [[operations:starting_monitoring_v2|Starting and monitoring the observations]] |
| - | * [[operations:starting_monitoring_urEOP|Additional tasks prior to starting Ultra-rapid EOP observations]] | + | |
| - | * [[operation:fringe_checking| Fringe-checking the AuScope array]] | + | |
| ==== After the Observations ==== | ==== After the Observations ==== | ||
| At the end of an observation: | At the end of an observation: | ||
| - | * [[operations:documentation.ivs.finishing|Finishing up]] | + | * [[operations:documentation.ivs.finishing_v2|Finishing up]] |
| - | * [[operations:documentation.ivs.newstart|Following on with another experiment]] | + | * [[operations:documentation.ivs.newstart_v2|Following on with another experiment]] |
| * [[operations:documentation.ivs.Logs|Processing logs and shipping data]] | * [[operations:documentation.ivs.Logs|Processing logs and shipping data]] | ||
| | | ||