This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision | |||
|
operations:minutes2013_11_12 [2013/11/12 03:45] Jim Lovell |
operations:minutes2013_11_12 [2013/11/14 03:17] (current) Jim Lovell |
||
|---|---|---|---|
| Line 17: | Line 17: | ||
| * R4610 | * R4610 | ||
| - Previous Action Items | - Previous Action Items | ||
| - | - Light in Ke control room (Brett, Martin). Still to do. Ask Martin to leave light on. | + | - Light in Ke control room (Brett, Martin). Still to do. Ask Martin to leave light on until the IPS has a light hooked up to it. |
| - | - Katherine RFI (Monitor full band (Martin, Jim)). WiFi turned off. Better? Is there a good data monitoring/collection method? (Jamie) No better! 1850 MHz headsets also seen. (Jim) | + | - Katherine RFI (Monitor full band (Martin, Jim)). The WiFi has been turned off. Better? Is there a good data monitoring/collection method? (Jamie) No better! 1850 MHz headsets also seen. (Jim) |
| - Processing logs, multiple disks [[operations:agenda2013_10_08_eg1|Example]] | - Processing logs, multiple disks [[operations:agenda2013_10_08_eg1|Example]] | ||
| - | - Hand editing required. Chris has volunteered to look at fixing the script(s) | + | - Hand editing is still required but Chris has a new script being tested. |
| - | - Which modules to use (Imogen, Jamie). See [[operations:start|Operations page]] | + | - Which modules to use (Imogen, Jamie). A list of which modules to use for each experiment is now on the wiki. See [[operations:start|Operations page]] |
| - 26m IVS documentation will need updating before May 2014 | - 26m IVS documentation will need updating before May 2014 | ||
| - | - Question for Brett: how to find out the network status at the three sites (e.g. 3G or wired). | + | - Question for Brett: how to find out the network status at the three sites (e.g. 3G or wired). Jim is working on a new monitoring script that will ring alarms/warnings when the network goes down etc. |
| - Recent software, hardware changes. | - Recent software, hardware changes. | ||
| - Jim to talk to Gino about diagnosing the problem at Katherine. Ongoing | - Jim to talk to Gino about diagnosing the problem at Katherine. Ongoing | ||
| - | - Mark5 to Yarragadee for conditioning | + | - Mark5 to Yarragadee for conditioning: shipped |
| - Operational issues | - Operational issues | ||
| - Jamie in Ceduna from this week until end of LBA run (back on 27th). On call: phone Ceduna control room 08 8625 3070 (pref), x6388 | - Jamie in Ceduna from this week until end of LBA run (back on 27th). On call: phone Ceduna control room 08 8625 3070 (pref), x6388 | ||
| - | - AUST17 cancelled | + | - AUST17 has been cancelled |
| - LBA Observing next week. Please volunteer :-) Can do IVS and LBA simultaneously from Mt Pleasant. | - LBA Observing next week. Please volunteer :-) Can do IVS and LBA simultaneously from Mt Pleasant. | ||
| - | - Upcoming 'marathon' observing run. Any questions? | + | - Next meeting will focus on observing the big session. Helpful to get as many observers to the meeting as possible. Doodle poll to be used |
| - | - Next meeting will focus on observing the big session. Helpful to get as many observers to the meeting as possible. | + | |
| - Q & A | - Q & A | ||
| - | - Jim chase up eremCtrl with Stuart | + | - Jim chase up eremCtrl with Stuart for Warkworth |
| - | - Pointing check at Yg problematical for OHIG85. | + | - Pointing check at Yg problematical for OHIG85. Unknown reason. |
| - Alarm when the network dies. And how to fix the problem. (Jim) | - Alarm when the network dies. And how to fix the problem. (Jim) | ||
| - Next meeting : ? | - Next meeting : ? | ||