This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
wg7:apod:318d_hbke [2016/11/18 05:55] Andreas Hellerschmied [Observation] |
wg7:apod:318d_hbke [2018/04/18 09:57] (current) Andreas Hellerschmied [Available files] |
||
|---|---|---|---|
| Line 25: | Line 25: | ||
| ===== Scheduling ===== | ===== Scheduling ===== | ||
| - | * With VieVS Satellite scheduling tool | + | * With VieVS Satellite scheduling tool, by A. Hellerschmied |
| * quasar block scheduled automatically | * quasar block scheduled automatically | ||
| * APOD scans manually scheduled | * APOD scans manually scheduled | ||
| - | * Schedule summary: {{:wg7:apod:318c_sum.txt|}} | + | * Schedule summary: {{:wg7:apod:318d_sum.txt|}} |
| * Block of 4 strong quasars was observed prior to APOD | * Block of 4 strong quasars was observed prior to APOD | ||
| * Min scan duration set to 40 sec | * Min scan duration set to 40 sec | ||
| * Sub-netting deactivated | * Sub-netting deactivated | ||
| * See catalog files for full setup | * See catalog files for full setup | ||
| + | * 1 sec time gap in VEX files between APOD scans | ||
| + | * Continuous tracking and recording | ||
| ===== Observation ===== | ===== Observation ===== | ||
| Line 40: | Line 42: | ||
| ==== Tracking ==== | ==== Tracking ==== | ||
| - | * Satellite tracking based on direct AzEl input files at {{:wg7:apod:318c_sum.txt|Hb}}, {{:wg7:apod:kath12m_2016_11_13_21_13_05_trf.txt|Ke}}, {{:wg7:apod:hobart26_2016_11_13_21_20_01_trf.txt|Ho}} | + | * Satellite tracking based on direct AzEl input files at {{:wg7:apod:kath12m_2016_11_13_22_46_39_azel.txt|Ke}} and {{:wg7:apod:yarra12m_2016_11_13_22_49_22_azel_merged.txt|Yg}} |
| - | * Azel values calculated in VieVS based on predicted APOD state vectors (pos. + vel., WGS84) provided by J. Sun | + | * Azel values directly taken from tracking files provided by J. Sun |
| * Station equipment controlled with station dependent VEX files | * Station equipment controlled with station dependent VEX files | ||
| - | |||
| - | |||
| - | ===== Correlation ===== | ||
| - | |||
| ===== Available files ===== | ===== Available files ===== | ||
| - | Files are available on the VieVS server (''vievs.hg.tuwien.ac.at'', user: sorts) at ''/home/sorts/apod/2016/'' | + | * All control files used for the observations (VEX schedules, schedule summaries, orbit files, AzEl tracking files, etc.) are provided on the VieVS server (''sorts@vievs.hg.tuwien.ac.at'') at ''/home/sorts/apod/2016/'' |
| - | * Azel tracking files for Ho, Hb, Ke | + | * Results: |
| - | * VEX file (station depended and combined) | + | * Plot showing fringe fitting results (residual multiband delays, delay rates, SNR, formal errors): {{:wg7:apod:318d.07.png?200|}} |
| - | * VIE_SCHED files | + | * VSO observation files containing the multiband total delays calculated by HOPS/fourfit (remove the .txt file name extension to load the VSO files in VieVS): {{:wg7:apod:318d.07_redclk-ion_free.vso.txt|}} {{:wg7:apod:318d.07_redclk-s.vso.txt|}} {{:wg7:apod:318d.07_redclk-x.vso.txt|}} |
| - | * used control + catalog files | + | |
| - | * predicted WGS84 state vectors (1 sec interval, by J. Sun) | + | |
| - | * predicted AzEl posititons (1 sec interval, by J. Sun) | + | |
| - | * final GCRF state vectors (1 sec interval, by J. Sun) | + | |
| - | + | ||