Please use this page to write up any notes on anything that needs to be passed on to the next observer or should go into the end of experiment message.
Notes should be placed below the horizontal line as a new blog entry.
Continuing problems should be copied to the Current Issues page.
Be sure to add any specific notes about the experiment if required, for example “Special back end configuration for x reason”. Put as much detail as you can - the more the better.
====== Experiment Name ====== **Hobart 12m** Disk VSN: abc-123 | Data volume at beginning: 2.34 GB * 1300UT a comment from me (user) **Katherine 12m** Disk VSN: | Data volume at beginning: GB * **Yarragadee 12m** Disk VSN: | Data volume at beginning: GB * 1300UT Experiment started okay (JMc).
Format for entering a comment It is important to stick to this formula - there is a good reason we need this information, so please include it!
Time stamp in UT * Comment * (Your Name)
For Example:
20:00UT: Wind stows, Missed scans 012-3456 to 012-3457 (Jim)
20:50UT: Mark5 lost connection, had to restart Mark5 and reconfigure DBBC, called Jamie on call to fix, missed scans 012-3456 to 012-4567 (Jim)
Again - as much detail as you can. It is important to remember that these notes will be sent to the correlator, so please make sure they make sense to others.
Hobart 12m:
Disk VSN: HOB+0072
Data volume at beginning: 3297 gb
Katherine 12m:
Disk VSN: USN-0069
Data volume at beginning: 0 gb
Yarragadee 12m:
Disk VSN: UVLBI-25
Data volume at beginning: 0 gb
Hobart 26m
Module: HOB+0106, start pos: 0.0GB
Hobart 12m
Recording to HOB+0072, initial disk position= 1.731GB
Katherine
Recording to MAT+0008, initial disk position= 727.146GB
Yarragadee
Recording to HOB+0125, initial disk position= 10081.384GB
General Notes: With all three of the telescopes since my shift started (and I am pretty sure well before), there has been a lot of 'previous source in this schedule not reached before new source was commanded'. They look to be popping up every 15-17 minutes fairly consistently so it seem they are when the dynamic scheduler is grabbing a new schedule and executing mid slew of another schedule? (Tiege)
Hobart
Module: HOB+0097, unknown starting disc position
Katherine
Module: ULVBI-29, unknown starting disc position. USN-0062 (second disk) 0.000 GB
Yarragadee
Module: HOB+0125, unknown starting disc position
Hobart 12m
Module: HOB+0033, start pos: 0.0 GB
Katherine
Module: ULVBI-29, start pos: 0.0 GB
Yarragadee
Module: WSRT-047, start pos: 0.0 GB
Hobart 12m
Module: USN-0102, start pos: 1240.317 GB
Katherine
Module: USN-0085, start pos: 770.671 GB
Yarragadee
Module: HOB+1000, start pos: 1697.335 GB