A test to see if the two UPS units in rack 14 can keep the DBBC, PCFS, Mark5B, IF unit running in the event of a power failure.
Power was removed to the UPS powering the DBBC and PCFS for 2 min. No interruption to either unit was seen. Similarly, the test was run on the UPS powering the Mark5B equipment and IF unit, and was successful.