This wiki is not maintained! Do not use this when setting up AuScope experiments!
R1717
Hobart
Module: HOB+0068, start pos 0 GB
13:10 UT - Clock jump. (Ellen)
Katherine
Module: ULVBI-27, start pos 0 GB
20:16 - dbbc would not reconnect after restart for clock drift. Missed scans 341-2016 onwards.(Ross)
05:20 schedule halted after several clock breaks.
08:50 schedule halted after several clock breaks. Reconfiguring DBBC (Dave)
342-0856a missed
09:41 DBBC still skipping. Trying another reconfig.
12:42 UT - Delay difference started drifting. I logged on the DBBC VNC ready to reconfig and watched it just re-start itself. The drives also turned off mid way through the scan 342-1242a. Missed scan 342-1245b and half of 342-1249b. (Ellen)
12:51 UT - Delays still drifting. Halting schedule and restarting DBBC again. And again. Looks to have stabilised. The field system then crashed. I restarted everything again and now it looks ok. Missed scans 342-1254 to 342-1333b inclusive. (Ellen)
13:52 UT - started drifting AGAIN. Following Jamie's advice I'm giving up and leaving it. (Ellen)
Yarragadee
Module: NAIC-004, start pos 0 GB
You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/pages/handover/r1717.txt · Last modified: 2015/12/08 17:28 by Jesse Swan