R4675

Hobart 12m

UAO-0026/2000, 23GB

  • Started a bit late due to rebooting of pcfshb and mk5hb prior to the experiment in order to restore mk5cm connection (Liza)
  • 18:44-48UT reconfigured DBBC due to a wrong firmware started at the beginning. Scans affected: 050-1840, 050-1848. First allegedly good scan: 050-1853 (Liza)
  • 21:54UT DIMino self-terminated, restarted (Liza)
  • 21:59UT DIMino self-terminated, restarted (Liza)
  • Missed scan 051-0524a through 051-0602 due to disk swap and subsequent issue with mk5 (Ross).
  • 06:25UT Scan 051-0625 is the first recorded since 051-0524a. It seems bank A of the mk5 is not working properly. We are now recording to bank B, module HOB+1011. (Chris)

Katherine 12m

  • USN-0191/2000, 0GB
  • Started a bit late due to restart of Hb system, first several scans recorded on HOB+0124/3200, first allegedly good scan 050-1843a (Liza)

Yarragadee 12m

  • SHVL-012/2000, 0GB
  • Started a bit late due to restart of Hb system, first several scans recorded on HOB+0124/3200, first allegedly good scan 050-1837 (Liza)
  • 11:25UT: Scan 051-1119c has the last 4 minutes waiting at the elevation limit - the source may not be properly within the beam (Chris)
  • 15:00 UT: Contacted Michael onsite to restart the D-Link router as all connections to Yg had been severed. Connections re-established at 15:35 UT.(vk)