skip to content
AuScope VLBI Operations Wiki
User Tools
Log In
Site Tools
Search
Tools
Show pagesource
Old revisions
Backlinks
Recent Changes
Media Manager
Sitemap
Log In
>
Recent Changes
Media Manager
Sitemap
You are here:
start
»
handover
»
aust53
Trace:
•
aust53
Sidebar
Home
Operations
Contact information
schedules
Documentation for operators
Handover notes
Current Issues
Meetings
Archive
Technical
handover:aust53
This wiki is not maintained! Do not use this when setting up AuScope experiments!
This is an old revision of the document!
aust53
Hobart (26m)
04:38 UT: wiring error of pps at Hobart was corrected. Don't know what the impact was before
The LO unlocked several times for short periods from 23:00 till 01:30 UT (Liza)
rxp#Receiver focus X : -256.4mm ; Y : 250.8mm ; Z : 18.6mm; – Y should be 248mm (Liza)
Recording to 4 TB module USN-0014 in bank B, +0
GB
(Chris)
(11:50 UT) Just noticed that the receiver has become unlocked at a few points (Chris)
10:33 UT
10:38 UT
11:08 UT
11:09 UT
11:13 UT
11:48 UT
13:00 UT Moved dish about and seemed to fix unlock problem by about 12:30 with some subsequent intermittent (mostly momentary) loss of lock.(warren)
lost lock at 18:38 to 18:47 (w)
again unlocked 20:20 and 21:02 and 21:20 (w)
Hobart (12m)
04:38 UT: wiring error of pps at Hobart was corrected. Don't know what the impact was before
Recording to 6 TB module HAY-0055 in bank B, +0
GB
(Chris)
Katherine
Recording to 8 TB module HOB+0068 in bank A, +0
GB
(Chris)
Yarragadee
Recording to 6 TB module OAN+0103 in bank A, +0
GB
(Chris)
You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/attic/handover/aust53.1413434488.txt.gz
· Last modified: 2014/10/16 04:41 by
liza
Page Tools
Show pagesource
Old revisions
Backlinks
Back to top