User Tools

Site Tools


handover:r1689

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


Achtung! R1 TRANSFER IN PROGRESS! MONITORING REQUIRED!

R1 monitoring instructions: operations:monitoring.ivs.etransfer

R1689

Hobart 12m:

Disk VSN: HOB+1003/8000/1024

Data volume at beginning: 3.4TB

Occasional error: “WARNING: error s5 -104 rfpcn: time-out, connection closed” (Anita)

Autocorrelation spectra for channels 4 - 7 are pretty slopey, and RFI in last 2 channels as normal (Anita)

Yarragadee 12m:

Disk VSN: HOB+0076/8000/1024

Data volume at beginning: 27Gb

  • 23:05 UT - Yg maser status for AHM power = 24.0 and Pump2kV = 0.8. These are now highlighted blue. Hb and Ke are 24.2 and 3.5 respectively. Informed Brett (vk)
  • 04:48 UT - Maser status OK now (vk)
/home/www/auscope/opswiki/data/attic/handover/r1689.1432702150.txt.gz · Last modified: 2015/05/27 04:49 by Vasaant Krishnan