User Tools

Site Tools


handover:r4689

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


R4689

Achtung! R1 TRANSFER IN PROGRESS! MONITORING REQUIRED!

R1 monitoring instructions: operations:monitoring.ivs.etransfer

UT 08:22: Pointings good for all 3 telescopes (JS)

UT 08:38: Fringes found in both(?) bands for all 3 telescopes (JS)

Hobart 12m:

Disk VSN: HOB+1003/8000/1024

Data volume at beginning: 5052.945 GB

  • UT 18:27 Windstow active until: 18:31:16 scans missed: 148-1830b (JS)
  • UT 02:50 - Halted schedule to restart DBBC. pps_delay value was drifting, which resulted in clock drift. Restarted at 03:06 UT. Missed scans 149-0251 to 149-0258a (vk)

Katherine 12m:

Telescope was involved in a survey recently, check extra carefully everything is ok.Ryan will be there in the morning Thursday sometime (might be early). Mick can go out to the telescope up until Friday lunchtime.(Brett via Anita)

Disk VSN: BKG-0049/2000

Data volume at beginning: 1.218 GB

Experiment started OK

Yarragadee 12m:

Disk VSN:UVLBI-13/2000

Data volume at beginning: 0.513 GB

UT 18:31 Waiting at limit at start of experiment, missed scan 148-1830b (JS)

Note: IF values were at S-RCP 15, X-LCP 7 I reset these to the nominal S-RCP 10 X-LCP 7 and the attenuations seem fine

e-control wasn't connecting but the new one (that we haven't used for aaaages) connects fine :-|

You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/attic/handover/r4689.1432868499.txt.gz · Last modified: 2015/05/29 03:01 by Vasaant Krishnan