This is an old revision of the document!
Remote connection to dBBC3 can be done via (addr: dbbc3[hb].*):
Select dBBC3 ops mode and version control. Initial options:
Launch DBBC Client v4. exe to communicate and launch the dBBC3 commands.
One offset calibration per board, so in total it is needed to conduct the offset calibration 6 times.
Again 6 calibrations are needed.
Do it after the gain and offset calibration. Use similar initial settings for each board as in the Calibration gain procedure.
Last calibration made by Guifré on 19.02.2019.