User Tools

Site Tools


operations:agenda2013_11_12

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


AuScope VLBI Operations meeting : 12 Nov 2013, 2 PM, Agenda

  1. Review of recent experiments.
    1. Experiments reviewed:
      1. Correlation/analysis reports:
      2. recently observed
        • AUST16
        • R1610
        • R4610

jamie in CD timing of next meeting: procedures

  1. Previous Action Items
    1. Light in Ke control room (Brett, Martin). Still to do.
    2. Katherine RFI (Monitor full band (Martin, Jim)). WiFi turned off. Better? Is there a good data monitoring/collection method? (Jamie)
    3. Processing logs, multiple disks Example
      1. Hand editing required. Chris has volunteered to look at fixing the script(s)
    4. Which modules to use (Imogen, Jamie). See Operations page
    5. 26m IVS documentation will need updating before May 2014
  2. Recent software, hardware changes.
    1. Jim to talk to Gino about diagnosing the problem at Katherine. Ongoing
    2. Mark5 to Yarragadee for conditioning
  3. Operational issues
    1. Jamie in Ceduna from this week until end of LBA run. On call: phone Ceduna control room x(+61-8) 8625 3070
  4. Q & A
    1. Question for Brett: how to find out the network status at the three sites (e.g. 3G or wired).
  5. Next meeting : Tue 12 Nov at 2 PM
/home/www/auscope/opswiki/data/attic/operations/agenda2013_11_12.1384209745.txt.gz · Last modified: 2013/11/11 22:42 by Jim Lovell