User Tools

Site Tools


operations:agenda2016_09_01

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
operations:agenda2016_09_01 [2016/09/01 02:04]
Lucas Hyland
operations:agenda2016_09_01 [2016/09/15 00:43]
Nick Ham
Line 1: Line 1:
-**Chair/​Presenting:​**  ​Lucas/Jessee+**Chair/​Presenting:​**  ​Nick/Liz
  
-**In Attendance:​** ​ Lucas+**In Attendance:​**  ​Nick (Lucas, Jesse, Liz, Bryn, Lucia, Arwin, Jim, Jamie)
  
-**Apologies:​** ​+**Apologies:​** ​Ross
  
 **Absent:** **Absent:**
Line 11: Line 11:
 **Agenda:** **Agenda:**
  
-  * Issues past fortnight:​ +Issues past fortnight: 
-  * RD1607Receiver was stuck on L band. OTTER interface had crashed, needed J-Mac'​s help to restart the OTTER server and successfully communicate with the receiver again. Caltsys was giving error due to it being setup for the DBBC instead of the mark 4, J-Mac edited the .prc file (Arwin). + 
-  * Lots of RXMON errors. e.g **ALARMerror s5 -104 rfpcn: time-out, connection closed**. Is this a problem? However the fix appears to be to restart RXMON on pcfs$s. Is this a critical error? (Tiege). +  
-  * f +  * AUG028Proc and skd files not present in master schedule or up on cddis 
-  * The [[http://​auscope.phys.utas.edu.au/​opswiki/​doku.php?​id=operations:​log|Module Allocation]] page is up.+ 
 +Other discussions
 + 
  
  
/home/www/auscope/opswiki/data/pages/operations/agenda2016_09_01.txt · Last modified: 2016/09/15 00:46 by Nick Ham