User Tools

Site Tools


operations:agenda2016_09_01

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
operations:agenda2016_09_01 [2016/09/01 02:42]
Lucas Hyland
operations:agenda2016_09_01 [2016/09/15 00:46] (current)
Nick Ham
Line 1: Line 1:
 **Chair/​Presenting:​** ​ Lucas/Jesse **Chair/​Presenting:​** ​ Lucas/Jesse
  
-**In Attendance:​** ​ Lucas+**In Attendance:​** ​ Lucas, Jesse, Liz, Bryn, Nick, Lucia, Arwin, Jim, Jamie
  
-**Apologies:​** Ellen, Jonny+**Apologies:​** Ellen, Jonny,
  
 **Absent:** **Absent:**
Line 13: Line 13:
 Issues past fortnight: Issues past fortnight:
   * RD1607: Receiver was stuck on L band. OTTER interface had crashed, needed J-Mac'​s help to restart the OTTER server and successfully communicate with the receiver again. Caltsys was giving error due to it being setup for the DBBC instead of the mark 4, J-Mac edited the .prc file (Arwin).   * RD1607: Receiver was stuck on L band. OTTER interface had crashed, needed J-Mac'​s help to restart the OTTER server and successfully communicate with the receiver again. Caltsys was giving error due to it being setup for the DBBC instead of the mark 4, J-Mac edited the .prc file (Arwin).
 +  * Happens (perhaps) if power failure/​glitch. OTTER needs to be reset. sudo otter reset. In setup notes now.
 +  * Caltysys only knows about one backend.  ​
 +
   * Lots of RXMON errors. e.g **ALARM: error s5 -104 rfpcn: time-out, connection closed**. ​   * Lots of RXMON errors. e.g **ALARM: error s5 -104 rfpcn: time-out, connection closed**. ​
 +  * Yg was being mucked around with, so this is not sinister.
     * Is this a problem? However the fix appears to be to restart RXMON on pcfs$s. Is this a critical error? (Tiege).     * Is this a problem? However the fix appears to be to restart RXMON on pcfs$s. Is this a critical error? (Tiege).
    
Line 19: Line 23:
  
 Other discussions:​ Other discussions:​
-  * +  * additional Ho-Hb observations (Lucia) 
-  *+    2gb/s + austral mode + wed/thurs after r1/sat after r4/monday before r1 (24hr) 
 +    * special setup for 2gb/s 
 +    * first one sept 7/9
  
  
  
/home/www/auscope/opswiki/data/attic/operations/agenda2016_09_01.1472697736.txt.gz · Last modified: 2016/09/01 02:42 by Lucas Hyland