User Tools

Site Tools


operations:agenda2017_04_13

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
operations:agenda2017_04_13 [2017/04/12 14:12]
Ross Turner created
operations:agenda2017_04_13 [2017/04/13 03:44] (current)
Ross Turner
Line 3: Line 3:
 Chair: Ross Chair: Ross
  
-Present: ​+Present: ​Jonny, Lucas, Arwin, Lucia, Jamie (God of AuScope), Tiege, Jesse
  
-Apologies:+Apologies: ​Jim, Ellen, Liz
  
-Absent: ​+Absent:
  
 General Issues: General Issues:
  
 +  * Jamie is the new Jim (at least for a few months). Direct questions to Jamie.
 +  * please do the handover notes carefully, in particular to a courtesy of your colleagues. Good to describe how much data missing, how late an experiment started etc. Say when something broke so we know along long it has been a problem.
 +  * May observing. We need the observers to step up. All important people away. All day shifts need to be done at Mt Pleasant so we can receive packages including modules; unbox and work out what is on module. We are also supposed to swap modules ready for next experiment. Arwin being trained up by Warren for when he is away for first two weeks of May and another week in late May. Brett to busy to provide much support.
 +  * Ross, Lucas, Tiege, Arwin and Jonny all available in May; maybe Liz?? Patrick and Mas may be trained up by then.
 +  * Check IVS master schedule in May; Hb and yg drop in and out that month (don't kill Brett).
 +  * Installation of new receiver in Hobart planned for June. Katherine and Yarragadee sometime early next year.
 +  * Need UT clock on ops8 or the wall.
 +  * MONEY!!! (potentially) any ideas? Need to spend what is budgeted, i.e. grand ideas.
 +  * Katherine and Yarragadee in alarms.
 +  * Issues sending log files; guy said they couldn'​t find log files then found them but they were zipped.
 +  * Arwin'​s thing: "t1 and "t2 to flag scans, lists times and scans.
  
 Handover Issues: Handover Issues:
-  * RD1704 VC rack timing out - had to travel out to Mt. P to reset the VC rack and the TTY Distributor. +  * Katherine pdfs had a flat CMOS battery on the motherboard;​ led to issues including no ssh connectionand incorrect time preventing synching -- r1787; was only pinging from local network, pcfs needed an fscheck and then reboots of mk5. Time set correctly using hclock
-    * Due to power failure +  * Key not turned on module at Hobart again -r4786; check during ​the day that module is ready.
-    * Strongly recommended to do setup on the previous day. +
-  * equip.ctl file check? +
-  * Wind sensor at hb locked up - continuous wind stow. Do we have fix for this in the wiki? +
-    * Ke & Yg (?) have IP switches - Requires turning off and on again. +
-    * Anemometer locked up - restart monica.weather (standard monica restart process) +
-  * Network issues at Ke - R1784 +
-    * Lost communication to VPN and Ke network. ​CMOS battery ​died in pcfske, rebooted, but wouldn'​t reconnect to network. Had to reboot pcfske through mk5ke. Might need to follow up on network configuration for the pcfske machine. +
-    * If you can't ping a machine from outside a sitetry pinging from something else on the local network. +
-  * Sending off logs Ross had problems sending off the logs for R1785Flogit backup script flogit_auscope.bkg.pl can be used if you have issues with the ftp to France. +
/home/www/auscope/opswiki/data/attic/operations/agenda2017_04_13.1492006371.txt.gz · Last modified: 2017/04/12 14:12 by Ross Turner