Line 1: Line 1:
-**Chair:​** ​Atifur+**Chair:​** ​Mas
  
-**Attended:​** ​+**Attended:​** ​Prad, Simin, Jesse, Katie, Tiege, Lucia, Jamie, Lucas, Artifur
  
-**Apologies:​** ​+**Apologies:​** ​Ross, Patrick, Arwin
  
-**Absent:​** ​+**Absent:​** ​Jonny
  
-**General ​Issues** +**Handover ​Issues**
-    * Ke clock jump/delay drift, fs crash +
-    * Ke ES Oven V in maserke was red (>25) for a minute then went blue (<1), but seems to be oscillating around the green range+
  
-    +Katherine 12m: 
-**Handover Issues** ​+    * Clock jump/delay drift, fs crash, need to reconfigure and restart the DBBC several times 
 +    The R1857 experiment was delayed due to wrong module. Need to check the module prior to avoid such an issue. Problem with internet connection and need to contact Mick to reset the power cycle.  
 +    ​Brett and Jamie will go to Katherine next week, so it will affect Jamie'​s duty on Tuesday morning. The Ke maser oscillating temperature need to be repaired. Katherine won't join some of the R experiment for next week.
  
-  * CRDS97 ​+Yarragadee 12m
-     ​08:54:53 UT - error m5 -900 : already off and error m5 -906 mark5 return code 6: inconsistent or conflicting requestThe recording ​    ​halted as a consequence of the above error+  Problem with internet connection (unable to connect to VNC server)Had to call Yarragadee on call person to stow the dish and reset the internet connection (T2127)
-     ​09:28:47 UT - For the previous 28.7 minutesthere was a watchdog warning which prevented ​the log from getting updated.+  If facing the internet connection and couldn'​t connect to Yg VPN and IPS website, call the Yg on call person. 
 + 
 +Hobart 12m: 
 +    * AUM experiment (AUM 007)the values like DBBC and PPS count quite different from the wiki values. Jamie need to look at the maser delay for Hobart. 
 +    * There was a problem with flogit command during ​the AUM experiment for Hobart 12m (when the system try to cross check the procedure file, the script crash when it couldn'​t find the proc file)So before run the slogit command for AUM, we need to upload the empty proc file. 
 +       
 +  
 +   
  
-  * AUM004 : 
-     * Drift in delay. DBBC rebooted. 
-     * After Experiment - data between ~0900-1510 recorded to another module, required for the subsequent R4 experiment. This had to be deleted in order to observe R4855 - no data will be available for correlation. Please make sure to check that the correct module is selected if the mark5/pcfs has been power cycled, before resuming the schedule. 
  
 + 
  
  
  