User Tools

Site Tools


operations:agenda2018_07_23

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
operations:agenda2018_07_23 [2018/08/23 03:34]
Atifur R. Khan
operations:agenda2018_07_23 [2018/09/06 03:39] (current)
Noor Md Said
Line 1: Line 1:
-**Chair:​** ​Atifur+**Chair:​** ​Mas
  
-**Attended:​** Prad, Ross, Simin, ​Jessie, Katie, Tiege, Lucia, Jamie+**Attended:​** Prad, Simin, ​Jesse, Katie, Tiege, Lucia, Jamie, Lucas, Artifur
  
-**Apologies:​** ​+**Apologies:​** ​Ross, Patrick, Arwin
  
-**Absent:​** ​Mas, Lucas+**Absent:​** ​Jonny
  
-**General Issues** +**Handover Issues**
-    * Ke clock jump/delay drift, fs crash +
-      Mk5 is proving unreliable, maser is not stable that might also cause it. Might change to backup Mk5 ke if keeps happening. FS crash related to Mk5. +
-    * Ke ES Oven V in maserke was red (>25) for a minute then went blue (<1), but seems to be oscillating around the green range. +
-      One of the external heater that stabilizes it. Brett is checking whether it is a read-out error or temperature problem. Should be fixed in a couple weeks time. +
-    * AUM missed scans +
-      Related to scheduling error.  +
-    * start/end messages +
-      Modify the end messages by hand. Include all the information about the experiment to your knowledge. +
-    * Dec/Jan roster +
-      New PhD recruits.  +
-    * 0 UT session start +
-      Perhaps start of 2019. Rearrangement of shifts? +
-    +
-**Handover Issues** ​+
  
-  * CRDS97 ​+Katherine 12m
-     ​08:54:53 UT - error m5 -900 : already off and error m5 -906 mark5 return code 6: inconsistent or conflicting request. The recording ​    ​halted as a consequence ​of the above error+    Clock jump/delay drift, fs crash, need to reconfigure ​and restart the DBBC several times 
-     Scheduling issue+    * The R1857 experiment was delayed due to wrong module. Need to check the module prior to avoid such an issue. Problem with internet connection and need to contact Mick to reset the power cycle.  
-     ​09:28:47 UT - For the previous 28.7 minutesthere was a watchdog warning which prevented ​the log from getting updated+    * Brett and Jamie will go to Katherine next week, so it will affect Jamie'​s duty on Tuesday morning. The Ke maser oscillating temperature need to be repaired. Katherine won't join some of the R experiment for next week
-     Error with Summary ​file. Should be careful since automatically generates schedule ​file.+ 
 +Yarragadee 12m: 
 +  * Problem with internet connection (unable to connect to VNC server). Had to call Yarragadee on call person to stow the dish and reset the internet connection (T2127)
 +  If facing ​the internet connection and couldn'​t connect to Yg VPN and IPS website, call the Yg on call person. 
 + 
 +Hobart 12m: 
 +    * AUM experiment (AUM 007), the values like DBBC and PPS count quite different ​from the wiki values. Jamie need to look at the maser delay for Hobart
 +    * There was a problem ​with flogit command during the AUM experiment for Hobart 12m (when the system try to cross check the procedure ​file, the script crash when it couldn'​t find the proc file)So before run the slogit command for AUM, we need to upload the empty proc file. 
 +       
 +  
 +   
  
-  * AUM004 : 
-     * Drift in delay. DBBC rebooted. 
-       ​Unknown. Could be maser. 
-     * After Experiment - data between ~0900-1510 recorded to another module, required for the subsequent R4 experiment. This had to be deleted in order to observe R4855 - no data will be available for correlation. Please make sure to check that the correct module is selected if the mark5/pcfs has been power cycled, before resuming the schedule. 
  
 + 
  
  
  
/home/www/auscope/opswiki/data/attic/operations/agenda2018_07_23.1534995259.txt.gz · Last modified: 2018/08/23 03:34 by Atifur R. Khan