This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
operations:documentation.ivs.logs [2011/06/03 03:43] Jim Lovell |
operations:documentation.ivs.logs [2013/12/04 19:38] (current) Jamie McCallum |
||
---|---|---|---|
Line 2: | Line 2: | ||
- | The procedure to follow here will depend on whether the data are being transferred to the correlator electronically (eTransfer) or shipped. Select from the table below: | + | The procedure to follow here will depend on whether the data are being transferred to the correlator electronically (eTransfer) or shipped: |
- | ^ Site ^ Shipping Method ^^ | + | ^ From ^ To: ^^^^ |
- | | Hobart | [[operations:documentation.ivs.logs.hbship|Shipping]] | [[operations:documentation.ivs.logs.hbetransfer|Electronic transfer]] | | + | ^ ^ Bonn ^ Washington ^ Haystack ^ VLBA ^ Curtin |
- | | Katherine | [[operations:documentation.ivs.logs.keship|Shipping]] | | | + | | Hb | eTransfer | eTransfer | eTransfer | ship | eTransfer |
- | | Yarragadee | [[operations:documentation.ivs.logs.ygship|Shipping]] | | | + | | Ho | eTransfer | eTransfer | eTransfer | ship | eTransfer |
+ | | Ke | eTransfer (*) | ship | ship | ship | eTransfer (*) | ||
+ | | Yg | eTransfer (*) | ship | ship | ship | eTransfer (*) | ||
+ | | * = modules are shipped to Hobart and then eTransferred |||||| | ||
+ | The correlator that the data are to be shipped to is given in the detailed listing on the Google Calendar and in the Master Schedule. See the [[operations:schedule|schedules]] page on this wiki. | ||
- | ===== Shipping media from Hobart ===== | + | Regardless of whether the data are to be shipped or eTransferred please follow these notes on [[operations:documentation.ivs.commentsfile| preparing the comments file and transferring the logs]]. |
- | * [[operations:documentation.ivs.hbpaperwork1|Prepare the shipping paperwork for Hobart]] | + | |
- | * [[operations:documentation.ivs.commentsfile|Prepare the comments file and transfer the logs]] | + | |
- | * [[operations:documentation.ivs.hbpaperwork2|Complete the paperwork, pack the disks and ship them]] | + | |
+ | At the moment all shipping of modules (physical or eTransfer) is being handled by observatory staff and on-call people. Operators: there's no need to proceed with any of the following steps. | ||
+ | If data are being eTransferred, the transfer can be started from Hobart if they are going to Bonn, but for Washington, the transfer is started from the correlator. | ||
- | ===== E-transfer from Hobart ===== | + | * Notes on making a [[operations:documentation.ivs.BonnETransfer|eTransfer to Bonn]] |
- | * [[operations:documentation.ivs.commentsfile|Prepare the comments file and transfer the logs]] | + | |
+ | Some additional steps are required when shipping modules and are done at the observatories: | ||
+ | ===== Shipping media from Hobart ===== | ||
+ | * [[operations:documentation.ivs.hbpaperwork1|Prepare the shipping paperwork for Hobart]] | ||
+ | * [[operations:documentation.ivs.hbpaperwork2|Complete the paperwork, pack the disks and ship them]] | ||
===== Shipping media from Katherine ===== | ===== Shipping media from Katherine ===== | ||
+ | |||
===== Shipping media from Yarragadee ===== | ===== Shipping media from Yarragadee ===== | ||
- | * [[operations:documentation.ivs.commentsfile|Prepare the comments file and transfer the logs]] | ||
+ | == Useful odds and ends == | ||
+ | - [[operations:documentation.ivs.useful|Useful log filtering commands]] | ||