User Tools

Site Tools


operations:documentation.ivs.logs

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
operations:documentation.ivs.logs [2011/06/03 04:23]
Jim Lovell [E-transfer from Hobart]
operations:documentation.ivs.logs [2013/12/04 19:38] (current)
Jamie McCallum
Line 4: Line 4:
 The procedure to follow here will depend on whether the data are being transferred to the correlator electronically (eTransfer) or shipped: The procedure to follow here will depend on whether the data are being transferred to the correlator electronically (eTransfer) or shipped:
  
 +^ From      ^ To:          ^^^^
 +^ ^ Bonn ^ Washington ^ Haystack ^ VLBA ^ Curtin
 +| Hb | eTransfer | eTransfer | eTransfer | ship | eTransfer
 +| Ho | eTransfer | eTransfer | eTransfer | ship | eTransfer
 +| Ke | eTransfer (*) | ship | ship | ship | eTransfer (*)
 +| Yg | eTransfer (*) | ship | ship | ship | eTransfer (*)
 +| * = modules are shipped to Hobart and then eTransferred ||||||
 +
 +The correlator that the data are to be shipped to is given in the detailed listing on the Google Calendar and in the Master Schedule. See the [[operations:​schedule|schedules]] page on this wiki.
 +
 +Regardless of whether the data are to be shipped or eTransferred please follow these notes on [[operations:​documentation.ivs.commentsfile| preparing the comments file and transferring the logs]].
 +
 +At the moment all shipping of modules (physical or eTransfer) is being handled by observatory staff and on-call people. Operators: there'​s no need to proceed with any of the following steps.
 +
 +If data are being eTransferred,​ the transfer can be started from Hobart if they are going to Bonn, but for Washington, the transfer is started from the correlator.
 +
 +  * Notes on making a [[operations:​documentation.ivs.BonnETransfer|eTransfer to Bonn]]
 +
 +Some additional steps are required when shipping modules and are done at the observatories:​
 ===== Shipping media from Hobart ===== ===== Shipping media from Hobart =====
   * [[operations:​documentation.ivs.hbpaperwork1|Prepare the shipping paperwork for Hobart]]   * [[operations:​documentation.ivs.hbpaperwork1|Prepare the shipping paperwork for Hobart]]
-  * [[operations:​documentation.ivs.commentsfile|Prepare the comments file and transfer the logs]] 
   * [[operations:​documentation.ivs.hbpaperwork2|Complete the paperwork, pack the disks and ship them]]   * [[operations:​documentation.ivs.hbpaperwork2|Complete the paperwork, pack the disks and ship them]]
  
- 
- 
-===== E-transfer from Hobart ===== 
-  * [[operations:​documentation.ivs.commentsfile|Prepare the comments file and transfer the logs]] 
-  * [[operations:​documentation.ivs.BonnETransfer|eTransfer to Bonn]] 
 ===== Shipping media from Katherine ===== ===== Shipping media from Katherine =====
 +
 ===== Shipping media from Yarragadee ===== ===== Shipping media from Yarragadee =====
-  * [[operations:​documentation.ivs.commentsfile|Prepare the comments file and transfer the logs]] 
  
 +== Useful odds and ends ==
 +  - [[operations:​documentation.ivs.useful|Useful log filtering commands]]
  
  
/home/www/auscope/opswiki/data/attic/operations/documentation.ivs.logs.1307075031.txt.gz · Last modified: 2011/10/26 06:37 (external edit)