This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
operations:documentation.ivs.logs [2012/04/26 05:19] Jim Lovell |
operations:documentation.ivs.logs [2013/12/04 19:38] (current) Jamie McCallum |
||
---|---|---|---|
Line 5: | Line 5: | ||
^ From ^ To: ^^^^ | ^ From ^ To: ^^^^ | ||
- | ^ ^ Bonn ^ Washington ^ Haystack ^ VLBA ^ | + | ^ ^ Bonn ^ Washington ^ Haystack ^ VLBA ^ Curtin |
- | | Hb | eTransfer | eTransfer | ship | ship | | + | | Hb | eTransfer | eTransfer | eTransfer | ship | eTransfer |
- | | Ho | eTransfer | eTransfer | ship | ship | | + | | Ho | eTransfer | eTransfer | eTransfer | ship | eTransfer |
- | | Ke | eTransfer (*) | ship | ship | ship | | + | | Ke | eTransfer (*) | ship | ship | ship | eTransfer (*) |
- | | Yg | eTransfer (*) | ship | ship | ship | | + | | Yg | eTransfer (*) | ship | ship | ship | eTransfer (*) |
- | | * = modules are shipped to Hobart and then eTransferred ||||| | + | | * = modules are shipped to Hobart and then eTransferred |||||| |
+ | |||
+ | The correlator that the data are to be shipped to is given in the detailed listing on the Google Calendar and in the Master Schedule. See the [[operations:schedule|schedules]] page on this wiki. | ||
+ | |||
+ | Regardless of whether the data are to be shipped or eTransferred please follow these notes on [[operations:documentation.ivs.commentsfile| preparing the comments file and transferring the logs]]. | ||
+ | |||
+ | At the moment all shipping of modules (physical or eTransfer) is being handled by observatory staff and on-call people. Operators: there's no need to proceed with any of the following steps. | ||
- | Regardless of whether the data are to be shipped or eTransferred please follow [[operations:documentation.ivs.commentsfile|these notes on preparing the comments file and transferring the logs]]. | ||
If data are being eTransferred, the transfer can be started from Hobart if they are going to Bonn, but for Washington, the transfer is started from the correlator. | If data are being eTransferred, the transfer can be started from Hobart if they are going to Bonn, but for Washington, the transfer is started from the correlator. | ||
Line 18: | Line 23: | ||
Some additional steps are required when shipping modules and are done at the observatories: | Some additional steps are required when shipping modules and are done at the observatories: | ||
- | |||
===== Shipping media from Hobart ===== | ===== Shipping media from Hobart ===== | ||
* [[operations:documentation.ivs.hbpaperwork1|Prepare the shipping paperwork for Hobart]] | * [[operations:documentation.ivs.hbpaperwork1|Prepare the shipping paperwork for Hobart]] |