User Tools

Site Tools


operations:documentation.ivs.logs

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
operations:documentation.ivs.logs [2012/11/13 05:18]
Jim Lovell [Processing log files and shipping the data]
operations:documentation.ivs.logs [2013/12/04 19:38] (current)
Jamie McCallum
Line 5: Line 5:
  
 ^ From      ^ To:          ^^^^ ^ From      ^ To:          ^^^^
-^ ^ Bonn ^ Washington ^ Haystack ^ VLBA ^ +^ ^ Bonn ^ Washington ^ Haystack ^ VLBA ^ Curtin 
-| Hb | eTransfer | eTransfer | ship | ship | +| Hb | eTransfer | eTransfer | eTransfer ​| ship | eTransfer 
-| Ho | eTransfer | eTransfer | ship | ship | +| Ho | eTransfer | eTransfer | eTransfer ​| ship | eTransfer 
-| Ke | eTransfer (*) | ship | ship | ship | +| Ke | eTransfer (*) | ship | ship | ship | eTransfer (*) 
-| Yg | eTransfer (*) | ship | ship | ship | +| Yg | eTransfer (*) | ship | ship | ship | eTransfer (*) 
-| * = modules are shipped to Hobart and then eTransferred |||||+| * = modules are shipped to Hobart and then eTransferred ​||||||
  
 The correlator that the data are to be shipped to is given in the detailed listing on the Google Calendar and in the Master Schedule. See the [[operations:​schedule|schedules]] page on this wiki. The correlator that the data are to be shipped to is given in the detailed listing on the Google Calendar and in the Master Schedule. See the [[operations:​schedule|schedules]] page on this wiki.
  
 Regardless of whether the data are to be shipped or eTransferred please follow these notes on [[operations:​documentation.ivs.commentsfile| preparing the comments file and transferring the logs]]. Regardless of whether the data are to be shipped or eTransferred please follow these notes on [[operations:​documentation.ivs.commentsfile| preparing the comments file and transferring the logs]].
 +
 +At the moment all shipping of modules (physical or eTransfer) is being handled by observatory staff and on-call people. Operators: there'​s no need to proceed with any of the following steps.
 +
 If data are being eTransferred,​ the transfer can be started from Hobart if they are going to Bonn, but for Washington, the transfer is started from the correlator. If data are being eTransferred,​ the transfer can be started from Hobart if they are going to Bonn, but for Washington, the transfer is started from the correlator.
  
/home/www/auscope/opswiki/data/attic/operations/documentation.ivs.logs.1352783936.txt.gz · Last modified: 2012/11/13 05:18 by Jim Lovell