This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
operations:minutes2013_10_31 [2013/10/30 23:35] Jim Lovell |
operations:minutes2013_10_31 [2013/10/31 04:29] (current) Jim Lovell |
||
---|---|---|---|
Line 2: | Line 2: | ||
- Review of [[operations:obssummary|recent experiments]]. | - Review of [[operations:obssummary|recent experiments]]. | ||
- | - Experiments to be reviewed (if correlation reports are in) plus any issues to raise from newer experiments observed but not yet correlated: | + | - Experiments reviewed: |
- | * [[operations:obssummary_2013_07|CRDS66]] - **review** | + | - Correlation/analysis reports: |
- | * [[operations:obssummary_2013_08|RD1306]] - **review** | + | * [[operations:obssummary_2013_07|CRDS66]] |
- | * [[operations:obssummary_2013_09|CRDS67]] - **review** | + | * [[operations:obssummary_2013_08|RD1306]] |
- | * R1603 - **review** | + | * [[operations:obssummary_2013_09|CRDS67]] |
- | * R4604 - **review** | + | * R1603 |
- | * R4605 - **review** | + | * R4604 |
- | * [[operations:obssummary|R1606]] - ** recently observed : review ** | + | * R4605 |
- | * CRF78 - ** recently observed : review ** | + | - recently observed |
- | * R4606 - ** recently observed : review ** | + | * [[operations:obssummary|R1606]] |
- | * AUST14 - ** recently observed : review ** | + | * CRF78 |
- | * R1607 - ** recently observed : review ** | + | * R4606 |
- | * R4607 - ** recently observed : review ** | + | * AUST14 |
- | * R1608 - ** recently observed : review ** | + | * R1607 |
- | * AUST15 - ** recently observed : review ** | + | * R4607 |
- | * R4608 - ** recently observed : review ** | + | * R1608 |
- | * TG009 - ** recently observed : review ** | + | * AUST15 |
- | * R1609 - ** recently observed : review ** | + | * R4608 |
+ | * TG009 | ||
+ | * R1609 | ||
- Previous Action Items | - Previous Action Items | ||
- | - Yg clock jumps (All, MOBLAS). No recent probs, delay diff now higher but looks stable. | + | - Yg clock jumps. No recent problems have been observed. The delay difference is now higher at ~0.4 us but looks stable. |
- Light in Ke control room (Brett, Martin). Still to do. | - Light in Ke control room (Brett, Martin). Still to do. | ||
- | - Fringe check script. OK now? (Jamie) Please tell Jamie if you have problems. | + | - Fringe check script. This seems to be working again but please tell Jamie if you have problems with it. |
- | - Katherine RFI (Monitor full band (Martin, Jim)). Intermittent, monitoring. Data monitoring/collection method? | + | - Katherine RFI (Monitor full band (Martin, Jim)). This seems to be intermittent, but we are monitoring it. Is there a good data monitoring/collection method? |
- Processing logs, multiple disks [[operations:agenda2013_10_08_eg1|Example]] | - Processing logs, multiple disks [[operations:agenda2013_10_08_eg1|Example]] | ||
- | - Hand editing required. **Chris has volunteered to look at fixing the script(s), Jim?** | + | - Hand editing required. Chris has volunteered to look at fixing the script(s) |
- Which modules to use (Imogen, Jamie). | - Which modules to use (Imogen, Jamie). | ||
- | - Roster | ||
- | - 20-day marathon. OK? | ||
- | - Some shifts may need to be tweaked a little (plus or minus an hour) to accommodate availability. | ||
- | - Schedule for 2014 | ||
- Recent software, hardware changes. | - Recent software, hardware changes. | ||
- | - DBBC: | + | - Jim to talk to Gino about diagnosing the problem at Ke. |
- | - Use v104_2 at Hb, Yg | + | - Jamie: A 26m Mark5A upgrade will allow Mk5B modules to be read. 5C going to Ceduna. |
- | - Use v102 at Ke (hardware change needed for v104_2, needs testing, ongoing) JIm talk to Gino | + | - Plans are afoot to allow the 26m and 12m to run off same clock, swap between them. |
- | - Jamie: 26m Mark5A upgrade will allow Mk5B modules to be read. 5C going to Ceduna. | + | - A 26m maser service is due soon. |
- | - Plans to allow 26m and 12m to run off same clock. | + | |
- | - 26m maser service due soon. | + | |
- 26m IVS documentation will need updating before May 2014 | - 26m IVS documentation will need updating before May 2014 | ||
- Operational issues | - Operational issues | ||
- Yarragadee support in November | - Yarragadee support in November | ||
- Q & A | - Q & A | ||
- | - | + | - Question for Brett: how to find out the network status at the three sites (e.g. 3G or wired). |
- Next meeting : Tue 12 Nov at 2 PM | - Next meeting : Tue 12 Nov at 2 PM | ||
- | - Brett: how to find out the network status at the three sites (e.g. 3G or wired). | ||