This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
yarragadee_todo [2011/04/10 08:47] Brett Reid |
yarragadee_todo [2015/10/14 05:57] (current) Jesse Swan |
||
---|---|---|---|
Line 1: | Line 1: | ||
ANTENNA STUFF \\ | ANTENNA STUFF \\ | ||
- | seal near el bearing into hub \\ | + | <del>Change gear oil</del> - Brett \\ |
- | cut cable ties in hub \\ | + | Grease bull gear and jack screw Jack and Peter T \\ |
- | drill drain holes in hub \\ | + | seal near el bearing into hub - Brett \\ |
- | paint top of turning head \\ | + | cut cable ties in hub - Brett\\ |
- | fit doors on hub \\ | + | drill drain holes in hub - Brett \\ |
- | light for antenna \\ | + | paint top of turning head - Brett maybe \\ |
- | identify rcp/lcp LNA and caable tie RF leads \\ | + | <del>fit doors on hub - Brett </del> \\ |
- | test dehydrator \\ | + | <del>light for antenna</del> - Randall \\ |
- | hub in pedestal \\ | + | identify rcp/lcp LNA and caable tie RF leads - Brett \\ |
- | A/C unit get attached \\ | + | <del>test dehydrator - Jamie </del> (Reads ok on web, currently at 20% duty cycle.\\ |
- | return shipping container \\ | + | <del>repair dehydrator - Randall</del>\\ |
- | paint pedestal floor \\ | + | <del>add verandah to pedestal electronics</del> - Dave\\ |
- | paint pedestal door \\ | + | hub in pedestal - not this trip\\ |
- | paint hold downs. \\ | + | A/C unit get attached - Peter T liase with Cramer and Neill - Warranty repair\\ |
+ | <del>return shipping container</del> - Brett \\ | ||
+ | paint pedestal floor - wait till dry \\ | ||
+ | paint pedestal door - Brett \\ | ||
+ | paint hold downs. - Jack/Peter T \\ | ||
\\ | \\ | ||
Brett and Jamie \\ | Brett and Jamie \\ | ||
+ | <del>run a schedule to elapse 50 hours</del> \\ | ||
phasecal/noisecal/5MHz/100MHz/PPS relative amplitudes. \\ | phasecal/noisecal/5MHz/100MHz/PPS relative amplitudes. \\ | ||
\\ | \\ | ||
CONTROL ROOM STUFF \\ | CONTROL ROOM STUFF \\ | ||
+ | Fix humidity monitor\\ | ||
Fringe test \\ | Fringe test \\ | ||
filing cabinet drawers. Ops, equipment, stuff. \\ | filing cabinet drawers. Ops, equipment, stuff. \\ | ||
Line 24: | Line 30: | ||
speaker mount \\ | speaker mount \\ | ||
network hub mount \\ | network hub mount \\ | ||
- | specan on net \\ | + | <del>specan on net</del> \\ |
test IF selector box and diagnose crosstalk problem \\ | test IF selector box and diagnose crosstalk problem \\ | ||
observer training. \\ | observer training. \\ | ||