skip to content
AuScope VLBI Operations Wiki
User Tools
Log In
Site Tools
Search
Tools
Show pagesource
Old revisions
Backlinks
Recent Changes
Media Manager
Sitemap
Log In
>
Recent Changes
Media Manager
Sitemap
You are here:
start
»
blog
»
dbbc_v104_testing_at_yg
Trace:
•
dbbc_v104_testing_at_yg
Sidebar
Home
Operations
Contact information
schedules
Documentation for operators
Handover notes
Current Issues
Meetings
Archive
Technical
blog:dbbc_v104_testing_at_yg
This wiki is not maintained! Do not use this when setting up AuScope experiments!
« Yg FS upgraded to 9.11.4
DBBC v104 testing at Hb »
DBBC v104 testing at Yg
Edited /usr2/control/equip.ctl and changed version to v104
on DBBC, started DBBC2 Control DDC v104_2.exe
created dbbc_config_file_104_calibration.txt
in pcfs:
dbbc=load=dbbc_config_file_104_calibration.txt
dbbc=reconf
dbbc=pps_sync
smlstat
smlrf=on (freq is 764
MHz
, level = -25)
dbbc=calibration
wrote 2013-274T044906-calib.txt
First nulls at 80, 66, 76, 79
Oops, forgot about AGC loop (not sure how critical)
dbbc=dbbcgain=all,man
dbbc=calibration
wrote 2013-274T045548-calib.txt
First nulls at 82, 71, 86, 84
dbbc=dbbcgain=all,man
on DBBC, created these files in C:\DBBC_CONF with default phase settings as shown above
dbbc_config_file_104_point.txt
dbbc_config_file_104_rapid.txt
on PCFS in /usr2/proc, edit point.prc and station.prc to point to these new config files
smlrf=off
Tried :
proc=r4606yg
setupsx
caltsys : values looked plausible
proc=point
initp
virgoa
fivept
Offsets look good
onoff x 4. Some variation. RFI?
then a bunch of Tsys measurements at zenith. Numbers looks consistent?
DBBC
,
Yg
You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/pages/blog/dbbc_v104_testing_at_yg.txt
· Last modified: 2013/10/02 05:01 by
Jim Lovell
Page Tools
Show pagesource
Old revisions
Backlinks
Back to top