Fringe test with Tsukuba and Kokee, starting at 00:00 UT and running for 2h.
RF unit showing cross-over switches both in “Direct” mode. Commenced observations recording nominal RCP.
12m signals going to DBBC/Mark5B and MarkIV-rack/Mark5A simultaneously. IF setup was as follows:
DBBC was loaded with new firmware from Gino shortly before the experiment. Dave Graham's DBBC setup procedure was followed.