User Tools

Site Tools


blog:dbbc_front_covers

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


dbbc_front_covers

During the Hobart miniTOW overheating of the rear pci cards was discussed. It was decided that the clear front panels should be re-installed to provide the correct airflow to the rear boards.

15/6/2012 - Front panel reinstalled on Hb dbbc. Now good airflow through rear slots.

20/6/2012 - Front panel reinstalled on Yg dbbc. Air exiting rear slots now much stronger and cooler.

Discussion

Moblas people, 2012/06/20 07:59

Jim, is this the best spot for this sort of minor equipment change entry? Or should it go in that link above - summary of recent SEFD measurements , events and changes (which seems oldish)?

Jim Lovell, 2012/06/21 11:31

That summary page should probably go, it was in use when we were debugging Hobart (mostly). This is the right place for logging this sort of thing.

You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/attic/blog/dbbc_front_covers.1340179007.txt.gz · Last modified: 2012/06/20 07:56 by Moblas people