User Tools

Site Tools


handover:aust40

This wiki is not maintained! Do not use this when setting up AuScope experiments!

AUST40

Jesse (UT 223/0700 - 223/1900)

DIM crashed on yg (prior to pointing check) returned “error m5 -23 mk5cn: error openingg, mark 5 probably not running”. Restarted DIM

Turns out the above DIM crash was probably due to a module swap (to 32TB) at yg.

I went full potato and reset the hb pcfs when I saw “no pcfs activity for xx” not realising it was due to a break between scans: probably lost scan 223-0709 because of this :-(

First scan for Katherine (0312-770 @ 07:00:00) did not occur as the target was below horizon(?) for entire length of scan.

Yg had a mk5 malfunction at 223.10:19 during scan 1037a “error m5 -104 mk5cn: time-out, connection closed”. PCFS restart, DIM restart.

Vasaant (UT 223/1900 - 224/0700)

Sources below elevation limit at Ke and Yg for source 1352-632 @ scan 223-2228 and at Ke again for source 1352-638 @ scan 224-0002b.

Power failure at Yg resulting in no data collection between UT 224/0312 - 0333. Scans missed: 224-0311, 224-0313.

You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/pages/handover/aust40.txt · Last modified: 2014/08/12 06:18 by Jesse Swan