This wiki is not maintained! Do not use this when setting up AuScope experiments!
This is an old revision of the document!
Current issues
New observers (+3), on-call people (+1)
Lounge
Upcoming events (maser maintenance April 11 - May 16)
Rostering
2nd and 4th R1 of every month is double the data rate, different Mk5 mode.
Clock breaks
DBBC delay
Stowing at the end: don't forget
Ready, start and end of experiment emails: Read and edit before sending
26m:
From Jim P: “We've made plans to replace the cold head on the S/X receiver - which is basically stuffed. It won't holdeth the coldeth without a vacuum pump for more than half a day now. The most likely cause is a helium leak. So the plan is to remove the S/X on Friday the 26th, replace the cold head with a refurbished one, and then put it back on March the 17th (yes it's a big job). If this is going to cause a problem, let us know ASAP.”
Q&A
Lollies
/home/www/auscope/opswiki/data/attic/operations/agenda2016_02_25.1456184723.txt.gz · Last modified: 2016/02/22 23:45 by Jim Lovell