skip to content
AuScope VLBI Operations Wiki
User Tools
Log In
Site Tools
Search
Tools
Show pagesource
Old revisions
Backlinks
Recent Changes
Media Manager
Sitemap
Log In
>
Recent Changes
Media Manager
Sitemap
You are here:
start
»
operations
»
down_under_2015_08_11_agenda
Trace:
•
down_under_2015_08_11_agenda
Sidebar
Home
Operations
Contact information
schedules
Documentation for operators
Handover notes
Current Issues
Meetings
Archive
Technical
operations:down_under_2015_08_11_agenda
This wiki is not maintained! Do not use this when setting up AuScope experiments!
Agenda
Issues from Ww
Issues from AuScope
Review of reported station issues:
Ww has new internet power switch to cylce GPIB when it fails will replace GPIB controller with RS-232 connection
Yarragadee r4696. VNC connection lost for several hours, no monitor (what about eRemoteControl?)
Yarragadee r1699. Monica restarted twice due to ifpic problems, not fixed?
Yg says “wth” not found, fixed? (& in all sy= commands?)
Katherine r1699. S1-S4 high Tsys most of the time (120-170k)
Ho. RFI, overflows in S5m S6 most of the time
Issues left over from last time:
0.7 nanosecond clock jumps causing significant data loss during analysis
wind-stow progress, next test
Brian agreed there is no need to move pcal to 26m
NTP configuration, need more servers, especially remote and non-TAC/CNS
“popen uptime” was added to all three AuScope 12m systems
Ed and Stuart to review status registers
Thanks for IPS/KVM/auto-login information
Ho antcn reliability issues?
Any luck getting spare VC parts? switch to DBBC at Ho?
/home/www/auscope/opswiki/data/pages/operations/down_under_2015_08_11_agenda.txt
· Last modified: 2015/08/11 22:33 by
Jim Lovell
Page Tools
Show pagesource
Old revisions
Backlinks
Back to top