Clock jump/delay drift, fs crash, need to reconfigure and restart the DBBC several times
The R1857 experiment was delayed due to wrong module. Need to check the module prior to avoid such an issue. Problem with internet connection and need to contact Mick to reset the power cycle.
Yarragadee 12m:
Problem with internet connection (unable to connect to VNC server). Had to call Yarragadee on call person to stow the dish and reset the internet connection (T2127)
Hobart 12m:
AUM experiment (AUM 007), the values like DBBC and PPS count quite different from the wiki values
/home/www/auscope/opswiki/data/attic/operations/agenda2018_07_23.1536195792.txt.gz · Last modified: 2018/09/06 01:03 by Noor Md Said