User Tools

Site Tools


operations:agenda2019_01_25

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


Chair:

Attended:

Apologies:

Absent:

General Issues

Handover Issues

  • Hobart 26m receiver temperature issues during aov019.
  • IF settings different for ho 26m with the mk5 backend. Check iread to see if power levels are attained
  • No end of experiment checklist popped for r1826 ke and yg
  • ERROR sc -13 setcl formatter to FS time difference 0.5 seconds or greater appearing for ho and ke, sometimes even with fs amd mk5 times being in sync
/home/www/auscope/opswiki/data/attic/operations/agenda2019_01_25.1516844462.txt.gz · Last modified: 2018/01/25 01:41 by Arwin Kahlon