User Tools

Site Tools


operations:minutes2015_06_23

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


Action items:

  1. Jim to tell to IVS that AuScope switches to Ho in all experiments from August 1 because of the broadband receiver test on 12m
  1. Liza to look at the pcal-diagnostic scripts for Katherine to figure out how to plot ampl/phase vs elevation and possibly other quantities.
  1. High X-band filter at Hobart (dbbchb) perhaps needs a change. Jamie to look if we have any spares.
  1. dbbcke is flaky recently – needs an investigation. What has been done in Feb during the repairs?–Jamie to remember and write down. Possible culprits of current problems: time distribution? Maser – vacuum pump failing? Maser service is due soon anyway.
  1. Mk5hb module change problems: observers/on-calls keep an eye on mk5hb. Changing modules while recording will not be done much in the near future anyway.
/home/www/auscope/opswiki/data/attic/operations/minutes2015_06_23.1435274457.txt.gz · Last modified: 2015/06/25 23:20 by liza