User Tools

Site Tools


yarragadee_todo

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


ANTENNA STUFF
Change gear oil - Brett
Grease bull gear and jack screw Jack and Peter T
seal near el bearing into hub - Brett
cut cable ties in hub - Brett
drill drain holes in hub - Brett
paint top of turning head - Brett maybe
fit doors on hub - Brett
light for antenna - Brett
identify rcp/lcp LNA and caable tie RF leads - Brett
test dehydrator - Jamie <\del> (Reads ok on web, currently at 20% duty cycle.
hub in pedestal - not this trip
A/C unit get attached - Peter T liase with Cramer and Neill - Warranty repair
return shipping container - Brett
paint pedestal floor - wait till dry
paint pedestal door - Brett
paint hold downs. - Jack/Peter T

Brett and Jamie
run a schedule to elapse 50 hours
phasecal/noisecal/5MHz/100MHz/PPS relative amplitudes.

CONTROL ROOM STUFF
Fringe test
filing cabinet drawers. Ops, equipment, stuff.
list of stuff incl photos
speaker mount
network hub mount
<del>specan on net

test IF selector box and diagnose crosstalk problem
observer training.

/home/www/auscope/opswiki/data/attic/yarragadee_todo.1302570336.txt.gz · Last modified: 2011/10/26 06:37 (external edit)