This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
handover:aua045 [2018/06/07 12:48] Noor Md Said |
handover:aua045 [2018/06/07 18:03] (current) Noor Md Said |
||
|---|---|---|---|
| Line 16: | Line 16: | ||
| 11:34UT - windstowed: 11:34-11:56 (scans no00183-no00186) (Patrick) | 11:34UT - windstowed: 11:34-11:56 (scans no00183-no00186) (Patrick) | ||
| + | |||
| + | 16:55UT - S/X receiver cryo pressure jumped to above 6 microns Hg, and 70K stage started warming up. No point driving out to Mt. Pleasant to fix it, as experiment only has 1 hour to go. (Patrick) | ||
| **Katherine 12m** | **Katherine 12m** | ||
| Line 45: | Line 47: | ||
| 07:00UT - Recieve ''an -103 pointing computer tracking errors are too large'' and ''qo -301 warning: onsource status is slewing!'' at the start of each scan. Telescope is late on source by a few seconds. (patrick) | 07:00UT - Recieve ''an -103 pointing computer tracking errors are too large'' and ''qo -301 warning: onsource status is slewing!'' at the start of each scan. Telescope is late on source by a few seconds. (patrick) | ||
| - | 12:43UT - Module MAT+0003 ran out of disk space. Called Yg, new module put in (HOB+0051). Schedule resumed at 12:50UT. (Patrick) | + | 12:43UT - Module MAT+0003 ran out of disk space. Called Yg, new module put in (HOB+0051). Schedule resumed at 12:50UT. Scan missed: no00194 (Patrick) |