User Tools

Site Tools


operations:log

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Operations

Schedules

Operations Meetings

Data Handling and Disk Logistics

Transfers

Please use the Transfers Page for information on data transfer.

Modules

See the Modules Page

AuScope IVS Module Allocation

If there are any questions or issues with module logistics, please contact auscope-operations@list.utas.edu.au with the details.

See Experiment and Module Catalog for module allocations, inventory, transfers, upcoming and historic experiments;

Telescope calibration/monitoring procedures and notes

Stairwell Displays

AuScope Operations Log

Please enter any significant events related to the AuScope VLBI project, including observations, configuration changes, hardware upgrades etc.

Yg FS upgraded to 9.11.4

FS software at Yg has been upgraded to 9.11.4 Detailed notes are here

2013/10/02 03:57 · 0 Comments

Hb FS upgraded to 9.11.3

The Field System software at Hb has been upgraded to version 9.11.3. We're still running v102 of the DBBC software. Testing of v104 is required. Here are detailed notes on what was done.

2013/09/25 06:37 · 0 Comments
,

Katherine pointing model update

Following reports of large pointing offsets (~0.05') from crf77, two days of pointing data was collected with acquire (252-254) and was processed with pdplt and update. The new model parameters are

-0.3152914345 0.0000000000 -0.0102583049 -0.0026900675 -0.0120386276 -0.0114547899 0.4862529337 0.0000000000 0.0000000000 0.0000000000 0.0000000000 0.0000000000 -0.0397695228 0.0000000000 0.0000000000 0.0000000000 0.0000000000 0.0000000000 0.0000000000 0.0000000000 0.0000000000 0.0000000000 0.0000000000 0.0000000000 0.0000000000 0.0000000000 0.0000000000 -0.0024999999 0.0000000000 0.0000000000

The pointing model in the controller has been adjusted as well.

Coeff Old model New model
P1 -0.0668 0.0026
P2 -0.2727 -0.3153
P3 0.0403 -0.0103
P4 0.0123 0.0115
P5 -0.0060 -0.0120
P6 not used
P7 0.4794 0.4863
P8 -0.0333 -0.0398
P9 -0.0025 -0.0025
2013/09/11 06:53 · 0 Comments

DBBC power modules

Measured supply voltage and ripple on the 2 Lambda power modules in base of Hobart12 DBBC.
Module 1
3.3V = 3.284V with 40mV P-P ripple
5V = 5.02V with 60mV P-P ripple
12V = 12.01V with 130mV P-P ripple
-5V = -5.03V with 100mV P-P ripple

Module 2
3.3V = 3.293V with 32mV P-P ripple
5V = 5.03V with 84mV P-P ripple
12V = 11.94V with 135mV P-P ripple
-5V = 5.03V with 70mV P-P ripple

Measured supply voltage and ripple on the 2 Lambda power modules in base of Yarragadee DBBC.
23/9/2013
Module 1
3.3V = 3.316V with 60mV P-P ripple
5V = 5.012V with 90mV P-P ripple
12V = 12.15V with 150mV P-P ripple
-5V = -5.01V with 100mV P-P ripple

Module 2
3.3V = 3.315V with 60mV P-P ripple
5V = 5.014V with 100mV P-P ripple
12V = 12.29V with 170mV P-P ripple
-5V = 5.02V with 80mV P-P ripple

2013/09/11 06:17 · 0 Comments