User Tools

Site Tools


handover:aug020

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


AUG020

Hobart

Module: HOB+0104, 0.77 GB

  • UT0630 Experiment started OK (JS)

Katherine

Module: HOB+0128, 0.77 GB

  • UT0630 Experiment started but with large clock offsets (JMC)
  • UT0632 Experiment halted to reconfigure DBBC.
  • UT0638, schedule resumed, UT0652 after problems with checkmk5 procedure but clock drifts continue.

Yarragadee

Module: HAY-0050, 0.64 GB

  • UT0630 Experiment started OK (JS)
You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/attic/handover/aug020.1452497765.txt.gz · Last modified: 2016/01/11 07:36 by Jesse Swan