User Tools

Site Tools


operations:agenda2016_02_25

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


Current issues

  1. New observers, on-call people
  2. Lounge
  3. Upcoming events (maser maintenance April 11 - May 16)
  4. Rostering
  5. 2nd and 4th R1 of every month is double the data rate, different Mk5 mode.
  6. Clock breaks
  7. Stowing at the end: don't forget :-)
  8. Ready, start and end of experiment emails: Read and edit before sending
  9. 26m:
    1. From Jim P: “We've made plans to replace the cold head on the S/X receiver - which is basically stuffed. It won't holdeth the coldeth without a vacuum pump for more than half a day now. The most likely cause is a helium leak. So the plan is to remove the S/X on Friday the 26th, replace the cold head with a refurbished one, and then put it back on March the 17th (yes it's a big job). If this is going to cause a problem, let us know ASAP.”
  10. Q&A
  11. Lollies
/home/www/auscope/opswiki/data/attic/operations/agenda2016_02_25.1456180482.txt.gz · Last modified: 2016/02/22 22:34 by Jim Lovell