This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
yarragadee_todo [2011/04/12 05:01] Moblas people |
yarragadee_todo [2015/10/14 05:57] (current) Jesse Swan |
||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ANTENNA STUFF \\ | ANTENNA STUFF \\ | ||
| - | Change gear oil - Brett \\ | + | <del>Change gear oil</del> - Brett \\ |
| Grease bull gear and jack screw Jack and Peter T \\ | Grease bull gear and jack screw Jack and Peter T \\ | ||
| seal near el bearing into hub - Brett \\ | seal near el bearing into hub - Brett \\ | ||
| Line 6: | Line 6: | ||
| drill drain holes in hub - Brett \\ | drill drain holes in hub - Brett \\ | ||
| paint top of turning head - Brett maybe \\ | paint top of turning head - Brett maybe \\ | ||
| - | fit doors on hub - Brett \\ | + | <del>fit doors on hub - Brett </del> \\ |
| - | <del>light for antenna</del> - Brett \\ | + | <del>light for antenna</del> - Randall \\ |
| identify rcp/lcp LNA and caable tie RF leads - Brett \\ | identify rcp/lcp LNA and caable tie RF leads - Brett \\ | ||
| <del>test dehydrator - Jamie </del> (Reads ok on web, currently at 20% duty cycle.\\ | <del>test dehydrator - Jamie </del> (Reads ok on web, currently at 20% duty cycle.\\ | ||
| + | <del>repair dehydrator - Randall</del>\\ | ||
| + | <del>add verandah to pedestal electronics</del> - Dave\\ | ||
| hub in pedestal - not this trip\\ | hub in pedestal - not this trip\\ | ||
| A/C unit get attached - Peter T liase with Cramer and Neill - Warranty repair\\ | A/C unit get attached - Peter T liase with Cramer and Neill - Warranty repair\\ | ||
| - | return shipping container - Brett \\ | + | <del>return shipping container</del> - Brett \\ |
| paint pedestal floor - wait till dry \\ | paint pedestal floor - wait till dry \\ | ||
| paint pedestal door - Brett \\ | paint pedestal door - Brett \\ | ||
| Line 18: | Line 20: | ||
| \\ | \\ | ||
| Brett and Jamie \\ | Brett and Jamie \\ | ||
| - | run a schedule to elapse 50 hours \\ | + | <del>run a schedule to elapse 50 hours</del> \\ |
| phasecal/noisecal/5MHz/100MHz/PPS relative amplitudes. \\ | phasecal/noisecal/5MHz/100MHz/PPS relative amplitudes. \\ | ||
| \\ | \\ | ||
| CONTROL ROOM STUFF \\ | CONTROL ROOM STUFF \\ | ||
| + | Fix humidity monitor\\ | ||
| Fringe test \\ | Fringe test \\ | ||
| filing cabinet drawers. Ops, equipment, stuff. \\ | filing cabinet drawers. Ops, equipment, stuff. \\ | ||