This wiki is not maintained! Do not use this when setting up AuScope experiments!
This is an old revision of the document!
AUST62
Hb Module HOB+0118 start pos 4831 GB
Ke Module HOB+0131 start pos 5310 GB
00:01 UT e-remote would not connect (according to Jesse it had been done for ages). Restarting e-remote fixed it for me, but it also caused Yg e-remote to close!! (Ellen)
00:39 UT “checkmk5” was not defined in the proc file and so no autocorrelation spectra were being generated which Jamie then fixed. First proper checkmk5 at 00:41 UT (Ellen)
02:07 UT e-remote would not open a checklist until 7th attempt, then as soon as I completed it e-remote just shut down (interesting new features…) (Ellen)
02:50 UT e-remote stopped responding and now won't close. (Ellen)
19:09:09 UT clock jump at Katherine, schedule halted at 19:14 for DBBC reconf. Bad scans: 327-1908 to 1912b. Missed scans 327-1914 to (Ellen)
Yg Module HOB+0119 start pos 5132 GB
00:27 UT Tsys bands 13, 14 consistently too high (between ~130 and 200) (Ellen)
02:05 UT Tsys band 12 now above 100 as well (Ellen)
You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/attic/handover/aust62.1416770582.txt.gz · Last modified: 2014/11/23 19:23 by Ellen Manning