This is an old revision of the document!
The procedure to follow here will depend on whether the data are being transferred to the correlator electronically (eTransfer) or shipped:
From | To: | |||
---|---|---|---|---|
Bonn | Washington | Haystack | VLBA | |
Hb | eTransfer | eTransfer | ship | ship |
Ho | eTransfer | eTransfer | ship | ship |
Ke | eTransfer (*) | ship | ship | ship |
Yg | eTransfer (*) | ship | ship | ship |
* = modules are shipped to Hobart and then eTransferred |