This wiki is not maintained! Do not use this when setting up AuScope experiments!
This is an old revision of the document!
Meeting 9th November
Chair: Ross
Present:
Apologies: Jonny, Lucas
Absent:
General Issues:
Handover Issues:
Ho: Vacuum pressure leak for receiver cooling system (AUA029)
Fixed! Caused by the weather warming.
Ke: Mick changed disk in middle of recording, was the mystery disk that was originally being recorded to every identified? (R4811)
This was sorted, thanks to Warren.
Make sure to check module allocation sheet.
Yg: Pointing offsets/tracking errors, Note from Arwin in handover notes: “During setup, noticed yg had large offsets in the antenna checks, had to the the pointing checks again and the offsets were better the second time around. This has happened a few times, should this be raised at the meeting?”
The pointing should be OK, Jamie is going to have a squiz.
/home/www/auscope/opswiki/data/attic/operations/agenda2017_11_09.1510191736.txt.gz · Last modified: 2017/11/09 01:42 by Ross Turner